SCOPE OUTLINE

PROJECT SCOPE OF SERVICES – Scope Outline (CMC - ENVELOPE)

This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.

PRE-DESIGN SERVICES

  1. Envelope/Water Intrusion Consultant (CMC) will conduct a 1 full-day site visit to review existing conditions and related considerations for new building envelope penetrations (e.g., wall fenestrations, etc.) and related requirements for tie-in junctures between new/renovation and existing construction.
  2. Envelope/Water Intrusion Consultant (CMC) will provide an electronic (PDF) summary report outlining field investigation findings and related recommendations pertaining to building envelope waterproofing.
  3. Participate in virtual meeting with GS to review Envelope/Water Intrusion (CMC) summary report of field investigation and related recommendations.

TASK 2- GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST

  1. Design Development
  2. 100% Design Development Internal CMC Review
  3. 100% Design Development 1-Day Workshop with AOR (GS)
  4. Construction Documents for GBF
  5. 60% Construction Documents Internal CMC Review
  6. 60% Construction Documents 1-Day Workshop with AOR (GS)
  7. 90% Construction Documents Review
  8. 90% Construction Documents Review Follow Up Meeting with AOR (GS)

TASK 3 - MAIN TERMINAL & CONCOURSE B EXPANSION DESIGN, PERMITTING & GMP ASSIST

  1. Design Development
  2. 100% Design Development Internal CMC Review
  3. 100% Design Development 1-Day Workshop with AOR (MLM)
  4. Construction Documents for GBF
  5. 60% Construction Documents Internal CMC Review
  6. 60% Construction Documents 1-Day Workshop with AOR (MLM)
  7. 90% Construction Documents Review
  8. 90% Construction Documents Review Follow Up Meeting with AOR (MLM)