November 22, 2021 Board Meeting - Items Needing Action - Over $325,000 Threshold
SCOPE OUTLINE
Scope of Services November 9, 2021
PROJECT SCOPE OF SERVICES – Scope Outline (CMC - ENVELOPE)
This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.
PRE-DESIGN SERVICES
Envelope/Water Intrusion Consultant (CMC) will conduct a 1 full-day site visit to review existing conditions and related considerations for new building envelope penetrations (e.g., wall fenestrations, etc.) and related requirements for tie-in junctures between new/renovation and existing construction.
Envelope/Water Intrusion Consultant (CMC) will provide an electronic (PDF) summary report outlining field investigation findings and related recommendations pertaining to building envelope waterproofing.
Participate in virtual meeting with GS to review Envelope/Water Intrusion (CMC) summary report of field investigation and related recommendations.
TASK 2- GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST
Design Development
100% Design Development Internal CMC Review
100% Design Development 1-Day Workshop with AOR (GS)
Construction Documents for GBF
60% Construction Documents Internal CMC Review
60% Construction Documents 1-Day Workshop with AOR (GS)
90% Construction Documents Review
90% Construction Documents Review Follow Up Meeting with AOR (GS)
TASK 3 - MAIN TERMINAL & CONCOURSE B EXPANSION DESIGN, PERMITTING & GMP ASSIST
Design Development
100% Design Development Internal CMC Review
100% Design Development 1-Day Workshop with AOR (MLM)
Construction Documents for GBF
60% Construction Documents Internal CMC Review
60% Construction Documents 1-Day Workshop with AOR (MLM)
90% Construction Documents Review
90% Construction Documents Review Follow Up Meeting with AOR (MLM)
Page | 46