SCOPE DETAIL

Scope of Services November 9, 2021

  • Specifications
  • Task 3 Design Development Deliverables include:
  • New and removal work drawings including
  • Telecommunications rooms preliminary layouts and elevations
  • Devices to be removed
  • Proposed device locations all systems
  • Preliminary rack and cabinet elevations
  • Systems diagrams
  • Specifications

Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.

1. Special Systems (ARORA):

  • Telecommunications, Security, Audio Visual Systems:
  • Refine all plan work, details, diagrams, and schedules based on DD and review set comments and final design coordination.
  • Perform final interdisciplinary review.
  • Finalize specifications to include detailed product lists, installation procedures and close out process.
  • Finalize software specifications including set up and testing requirements, demonstration, O&M and training requirements.

Task 2 Construction Document Deliverables include:

  • New and removal work drawings including
  • Devices to be removed
  • Finalized Backbone pathways and cable trays
  • Proposed device locations all systems including appropriate details references and tags
  • Details
  • Schedules
  • Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
  • Rack and Cabinet Elevations
  • Patch Panel Schedules
  • Telecommunications rooms preliminary layouts
  • Systems diagrams, Complete
  • Specifications
  • Task 3 Construction Document Deliverables include:
  • New and removal work drawings including
  • Devices to be removed
  • Proposed device locations all systems including appropriate details references and tags
  • Details
  • Schedules
  • Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
  • Rack and Cabinet Elevations

Page | 42