SCOPE DETAIL
Scope of Services
November 9, 2021
- e.Specifications
- Task 3 Design Development Deliverables include:
- a.New and removal work drawings including
- b.Telecommunications rooms preliminary layouts and elevations
- i.Devices to be removed
- ii.Proposed device locations all systems
- c.Preliminary rack and cabinet elevations
- d.Systems diagrams
- e.Specifications
Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.
1. Special Systems (ARORA):
- a.Telecommunications, Security, Audio Visual Systems:
- i.Refine all plan work, details, diagrams, and schedules based on DD and review set comments and final design coordination.
- ii.Perform final interdisciplinary review.
- ii.Finalize specifications to include detailed product lists, installation procedures and close out process.
- iv.Finalize software specifications including set up and testing requirements, demonstration, O&M and training requirements.
Task 2 Construction Document Deliverables include:
- a.New and removal work drawings including
- i.Devices to be removed
- ii.Finalized Backbone pathways and cable trays
- iii.Proposed device locations all systems including appropriate details references and tags
- b.Details
- c.Schedules
- d.Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
- e.Rack and Cabinet Elevations
- f.Patch Panel Schedules
- g.Telecommunications rooms preliminary layouts
- h.Systems diagrams, Complete
- i.Specifications
- Task 3 Construction Document Deliverables include:
- a.New and removal work drawings including
- i.Devices to be removed
- ii.Proposed device locations all systems including appropriate details references and tags
- b.Details
- c.Schedules
- d.Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
- e.Rack and Cabinet Elevations
Page | 42