Scope of Services
November 9, 2021
Specifications
Task 3 Design Development Deliverables include:
New and removal work drawings including
Telecommunications rooms preliminary layouts and elevations
Devices to be removed
Proposed device locations all systems
Preliminary rack and cabinet elevations
Systems diagrams
Specifications
Telecommunications, Security, Audio Visual Systems:
Refine all plan work, details, diagrams, and schedules based on DD and review set comments and final design coordination.
Perform final interdisciplinary review.
Finalize specifications to include detailed product lists, installation procedures and close out process.
Finalize software specifications including set up and testing requirements, demonstration, O&M and training requirements.
New and removal work drawings including
Devices to be removed
Finalized Backbone pathways and cable trays
Proposed device locations all systems including appropriate details references and tags
Details
Schedules
Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
Rack and Cabinet Elevations
Patch Panel Schedules
Telecommunications rooms preliminary layouts
Systems diagrams, Complete
Specifications
Task 3 Construction Document Deliverables include:
New and removal work drawings including
Devices to be removed
Proposed device locations all systems including appropriate details references and tags
Details
Schedules
Telecommunications Rooms Layouts and elevations including MEP/FP equipment, coordinated.
Rack and Cabinet Elevations
Page | 42