SCOPE DETAIL
- ii.ii. Show telecommunication space equipment and furniture layout. Identify key components including monitoring sensors, raised floor and cable tray systems, and interdisciplinary device coordination.
b. Security:
- iii.Provide network cabinet and wall elevations detailing equipment positions and interconnections (Task 2 only)
- iv.Provide single line and system diagrams, for all intended telecommunications systems.
- v.Provide equipment and installation details, riser diagrams, schedules and set coordination.
- vi.Provide outline division 27 specifications
- i.Layout communication and power pathways and routing plan for security devices provide pathway types and sizes, cable quantities and characteristics.
- ii.Show camera locations, view angles, and installation details for CCTV based on SD report.
- iii.Show door locations, specific electronic access control devices, and movement sensor device locations based on SD report.
- iv.Provide sequence of operations for ACS including integration with CCTV and/or existing systems. Include detailed information on normally open or closed characteristics and other parameters.
- v.Detail security riser diagrams, security rack layouts, and wall elevations. Provide detailed schedules for CCTV and ACS doors outlining all essential installation and configuration parameters.
- vi.Provide outline division 28 specifications
c. Audio Visual Systems:
- i.Speaker, microphone, digital display, amplification, control and distribution equipment
layout for conference rooms, auditoriums, lobbies, etc. based on calculations and findings from SD phase.
- ii.A/V block diagrams for audio, video and control distribution, including system interconnection and integration.
- ii.Installation details for displays, speakers, etc. including coordination with architectural and structural enclosures.
- iv.Equipment rack layouts and elevations
- v.Specifications defining hardware and software parameters, control requirements, and installation details and configurations.
- d.Software:
- i.Software requirements must be defined in specifications including all workstations required. Task 2 Design Development Deliverables include:
- a.New and removal work drawings including
- b.Telecommunications rooms preliminary layouts and elevations
- c.Preliminary rack and cabinet elevations
- d.Systems diagrams
- i.Devices to be removed
- ii.Backbone pathways
- iii.Proposed device locations all systems
Page | 41