SCOPE DETAIL
- vi.vi. Work with Telecommunications Designer to identify the network requirements and impacts along with a network security plan for protecting critical systems.
- c.Audio Visual Systems:
- i.Conduct a formal Needs Analysis to determine the specific activities the end users must perform.
- ii.Determine the required A/V presentation applications and the supporting tasks and functions to perform these functions. This includes systems such as audio/videoconferencing, public-address, digital signage, Cable TV distribution, etc. and the required level of integration between each system.
- ii.Define the physical and environmental conditions including size and layout of A/V centers (i.e. conference room, training room, auditorium, etc.) and begin to define the granular A/V task parameters.
- d.Software:
- i.Develop list of software that is required in specifications for the operation and function of any and all systems above.
- Task 2 Schematic Design Deliverables include:
- a.Telecommunications summary BOD taking into account the existing systems assessment.
- b.Telecom backbone cable proposed architecture
- c.Theoretical Wi-Fi Spectrum analysis
- d.ICT space requirements
- e.A/V needs assessment
- f.Identification of all software needs for all systems
- g.Access control and CCTV system architecture diagrams
- h.Proposed access-controlled points
- i.CCTV design criteria
- Task 3 Schematic Design Deliverables include:
- a.Telecommunications summary BOD considering the existing systems assessment.
- b.Wi-Fi Spectrum analysis
- c.Proposed network architecture, network expansion requirements, if any
- d.ICT space requirements
- e.A/V needs assessment and BOD
- f.Identification of all software needs for all systems
- g.Access control and CCTV system architecture diagrams
- h.Proposed access-controlled points
- i.CCTV design criteria
- Design Development Documents and Early Release Packages (ERP)- The Design Development documents will refine and further develop the design concept and space planning established during the Schematic Design Phase.
- Special Systems (ARORA)
- a.Telecommunications:
- Layout telecommunications pathways and routing plan. Provide pathway types and sizes, cable quantities and characteristics. Layout end devices. Provide installations details.
∴ ⋯⋯ ⋯ ⋯
Page | 40