SCOPE OUTLINE

PROJECT SCOPE OF SERVICES - Scope Outline (ARORA - SPECIAL SYSTEMS)

This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.

TASK 2 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST

  1. Schematic Design
  2. Telecommunications
  3. Audio/Visual
  4. Security
  5. Design Development
  6. Telecommunications
  7. Audio/Visual
  8. Security
  9. Construction Documents, Permit, GMP
  10. Telecommunications
  11. Audio/Visual
  12. Security

TASK 3 - MAIN TERMINAL & CONCOURSE B EXPANSION DESIGN, PERMITTING & GMP ASSIST

  1. Schematic Design
  2. Telecommunications
  3. Audio/Visual
  4. Security
  5. Design Development
  6. Telecommunications
  7. Audio/Visual
  8. Security
  9. Construction Documents, Permit, GMP
  10. Telecommunications
  11. Audio/Visual
  12. Security