SCOPE DETAIL

  • i. Final load calculations
  • Final specification development
  • Construction Manager interface
  • Coordination Meetings
  • Sustainability and Energy Modeling completion for code compliance
  • Riser and Flow Diagrams completion for MEP&FP
  • Lighting and Power completion
  • Fire protection plans showing scope of work, delegated design level.
  • Phasing Development
  • Controls Diagrams completion, including coordination with Owner on overall controls schemes.
  • Additional existing conditions survey work, as required, to support Construction Documents.
  • Internal Quality Assurance / Quality Control
  • 100% page turn with SRQ, address review comments.
  • Task 2 Construction Document Deliverables include:
  • Symbol Legends, Abbreviations, Code Compliance
  • Floor Plans
  • Enlarged Floor Plans for Mechanical and Electrical Rooms
  • One-line diagrams
  • Control Diagrams
  • Details
  • Schedules
  • Specifications for Divisions 21, 22, 23, 26
  • Code Compliance Energy Model
  • Task 3 Construction Document Deliverables include:
  • Symbol Legends, Abbreviations, Code Compliance
  • Floor Plans
  • Enlarged Floor Plans for Mechanical and Electrical Rooms
  • One-line diagrams
  • Control Diagrams
  • Details
  • Schedules for Divisions 21, 22, 23, 26
  • Specifications

Permitting: Prepare drawings for the Plan Review submissions to the AHJ (Authorities having Jurisdiction) and respond to questions and provide supplemental information as required to complete the Plan Review process. Ensure bid documents are updated to reflect additional information provided to the AHJ. Attend meetings as required with the AHJ's to complete the plan review process.