i. Final load calculations
Final specification development
Construction Manager interface
Coordination Meetings
Sustainability and Energy Modeling completion for code compliance
Riser and Flow Diagrams completion for MEP&FP
Lighting and Power completion
Fire protection plans showing scope of work, delegated design level.
Phasing Development
Controls Diagrams completion, including coordination with Owner on overall controls schemes.
Additional existing conditions survey work, as required, to support Construction Documents.
Internal Quality Assurance / Quality Control
100% page turn with SRQ, address review comments.
Task 2 Construction Document Deliverables include:
Symbol Legends, Abbreviations, Code Compliance
Floor Plans
Enlarged Floor Plans for Mechanical and Electrical Rooms
One-line diagrams
Control Diagrams
Details
Schedules
Specifications for Divisions 21, 22, 23, 26
Code Compliance Energy Model
Task 3 Construction Document Deliverables include:
Symbol Legends, Abbreviations, Code Compliance
Floor Plans
Enlarged Floor Plans for Mechanical and Electrical Rooms
One-line diagrams
Control Diagrams
Details
Schedules for Divisions 21, 22, 23, 26
Specifications
Permitting: Prepare drawings for the Plan Review submissions to the AHJ (Authorities having Jurisdiction) and respond to questions and provide supplemental information as required to complete the Plan Review process. Ensure bid documents are updated to reflect additional information provided to the AHJ. Attend meetings as required with the AHJ's to complete the plan review process.
age | 36