SCOPE DETAIL
a. Design development shall provide further refinement of Schematic Design documents, to include the following:
- i.Coordination Meetings
- ii.Updated load calculations
- ii.Prepare long form technical specifications.
- iv.Sustainability and Energy Modeling refinement for code compliance
- v.Riser and Flow Diagrams Development
- vi.Lighting and Power Development
- vii.Fire protection plans showing scope of work, delegated design level.
- viii.Phasing Development
- ix.Controls Diagrams Development, including coordination with Owner on overall controls schemes.
- x.Additional existing conditions survey work, as required, to support Design Development.
- xi.Internal Quality Assurance / Quality Control
- xii.60% page turn with SRO, address review comments.
Task 2 Design Development Deliverables include:
- a.Symbol Legends, Abbreviations, Code Compliance
- b.Floor Plans
- c.Enlarged Floor Plans for Mechanical and Electrical Rooms
- d.One-line diagrams
- e.Details
- f.Schedules
- g.Specifications for Divisions 21, 22, 23, 26
- Task 3 Design Development Deliverables include:
- a.Symbol Legends, Abbreviations, Code Compliance
- b.Floor Plans
- c.Enlarged Floor Plans for Mechanical and Electrical Rooms
- d.One-line diagrams
- e.Details
- f.Schedules
- g.Specifications for Divisions 21, 22, 23, 26
- Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.
- MEP&FP Systems (TLC): Perform MEP&FP engineering design services for each project component including the CEP improvements (design is based on Option 1 being selected; if SMAA selects Option 2, additional design will be necessary), Ground Boarding Facility, Concourse B Expansion and Main Terminal Expansion elements. The construction documents will be fully coordinated with respective disciplines within the Revit model in accordance with the BIM execution plan.
- a.Continuation of the Design Development phase of work
- b.Owner/Architect Meetings
- c.Construction Documents shall provide further refinement of Design Development, to include the following: