general electrical services needs to be trended, and a proposed energy model will be used to simulate the usage of the proposed system. Coupled with a cost estimator, the team will run an LCCA based on 30 years, with an acceptable payback of 6 years for options.
Presentations to SRQ for stakeholder review.
Identify the Energy Conservation Measures (ECMs) required to meet the 2020 Florida Energy Code.
Major equipment room allocations determined.
Coordination Meetings
Sustainability and Energy Modeling concepts for code compliance
Riser and Flow Diagrams Development
Preliminary lighting and power layout
Phasing Development for the MEP/FP systems and coordination with the CM
Concession Design Criteria Manual – outlining budgeted HVAC, Plumbing, and Electrical loads based on type of concessionaire. Inclusive of proposed routing for grease duct by the concessionaires.
Master Plan concept review for approval of schematic design approach.
Internal Quality Assurance / Quality Control
30% page turn with SRO, address review comments.
Task 2 Schematic Design Deliverables include:
Design Narrative
Symbol Legends, Abbreviations, Code Compliance
Floor Plans
One-line diagrams
Details
Schedules
Task 3 Schematic Design Deliverables include:
Design Narrative
Symbol Legends, Abbreviations, Code Compliance
Floor Plans
One-line diagrams
Details
Schedules
Design Development Documents and Early Release Packages (ERP)- The Design Development documents will refine and further develop the design concept and space planning established during the Schematic Design Phase.
MEP&FP Systems (TLC): Perform MEP&FP engineering design services for each project component including the CEP improvements (design is based on Option 1 being selected; if SMAA selects Option 2, additional design will be necessary), Ground Boarding Facility, Concourse B Expansion and Main Terminal Expansion elements. The drawings will show the location of major MEP&FP equipment in mechanical and electrical rooms, system distribution, and preliminary location of end devices such as air distribution, plumbing fixtures, sprinklers, lighting, and receptacles. Specifications will focus on identifying the quality for the scope of work for the major pieces of equipment.
Page | 34