PROJECT SCOPE OF SERVICES – Scope Outline (TLC – MEP&FP)
This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.
TASK 2 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST
- Schematic Design - 30% Narrative and Drawings
- a.Project Management
- b.Weekly Design Meetings
- C.Weekly OAC Meetings
- d.Site Visits
- e.Calculations
- f.Narratives to SMAA w/CEP Option #1 g,
- h.Drawing Development
- i.Specification Development
- j.Coordination
- k.Quality Control
- I.Response to Comments
- Design Development- 60% Drawings and Specifications
- a.Project Management
- b.Weekly Design Meetings
- c.Weekly OAC Meetings
- d.Drawing Development
- e.Specification Development
- f.Coordination
- g.Quality Control
- h.Response to Comments
- Construction Documents - 100% Drawings and Specifications
- a.Project Management
- b.Weekly Design Meetings
- C.Weekly OAC Meetings
- d.Drawing Development
- e.Specification Development
- f.Coordination
- g.Quality Control
- h.Response to Comments
- Permitting - Signed and Sealed documents.
- a.Permit Drawing Preparation/Plan Review Submission
- b.AHJ Question/Response Meetings & Coordination
- GMPAssist
- a.CMAR Coordination & Bidding RF/ Responses