PROJECT SCOPE OF SERVICES – Scope Outline (TLC – MEP&FP)

This Scope Outline lists tasks and individual Elements of Work the consultant will undertake to achieve the overall project design and are listed in the fee spreadsheet. The Level of Service, definition of tasks, list of deliverables, and excluded services are more fully defined in the Scope Detail that follows.

TASK 2 – GROUND BOARDING FACILITY (GBF) DESIGN, PERMITTING & GMP ASSIST

  1. Schematic Design - 30% Narrative and Drawings
  2. Project Management
  3. Weekly Design Meetings
  4. Weekly OAC Meetings
  5. Site Visits
  6. Calculations
  7. Narratives to SMAA w/CEP Option #1 g,
  8. Drawing Development
  9. Specification Development
  10. Coordination
  11. Quality Control
  12. Response to Comments
  13. Design Development- 60% Drawings and Specifications
  14. Project Management
  15. Weekly Design Meetings
  16. Weekly OAC Meetings
  17. Drawing Development
  18. Specification Development
  19. Coordination
  20. Quality Control
  21. Response to Comments
  22. Construction Documents - 100% Drawings and Specifications
  23. Project Management
  24. Weekly Design Meetings
  25. Weekly OAC Meetings
  26. Drawing Development
  27. Specification Development
  28. Coordination
  29. Quality Control
  30. Response to Comments
  31. Permitting - Signed and Sealed documents.
  32. Permit Drawing Preparation/Plan Review Submission
  33. AHJ Question/Response Meetings & Coordination
  34. GMPAssist
  35. CMAR Coordination & Bidding RF/ Responses