- ii.Continue to develop the design to issue ERP documents for permitting and GMP preparation by the CM
- b.Structural Framing Design
- i.Advance the design of columns, beams, slabs, and lateral resisting elements.
- ii.Coordinate and advance the details
- c.Design Production
- ii.Further the electronic documents showing the structural framing layout.
- i.Coordinate structural framing with other disciplines.
- ii.Prepare Structural General Notes.
- iii.Create plan drawings for the following:
- Foundations
- Floor and roof framing plans
- Prepare column and wall schedules if appropriate.
- Provide elevations of Lateral resisting elements if appropriate.
- Advance the detailing of structural conditions.
- Generate building sections and elevations as appropriate.
- Prepare long form technical specifications.
- Task 3 Design Development Deliverables include:
- a.Structural plans with major structural element types noted on plans.
- b.Preliminary structural technical specifications.
- Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.
- Structural (HEES - TASK 3): The design concepts and framing systems have already been established for the foundations and framing layout.
- a.Foundation Design: Continue coordination with the design team and the contractor. Construction Contract Administration scope for the ERP package will be submitted separately and not included as part of this scope.
- b.Structural Framing Design
- i.Finalize the structural design of the primary framing systems, incorporate information from GMP bid process
- ii.Advance the details for unique conditions, special structures and connections between new and existing structural members.
- iii.Develop strengthening details as required for modifications to existing structures
- iv.Detailed design of all girders, bents, columns, supports bearing details and perimeter panels.
- v.Details of connections to existing structures
- vi.Detail design of roof framing.
- vii.Coordination of escalators.
- viii.Exterior wall support design.
- Task 3 Construction Document Deliverables include:
- a.Final structural building floor plans, sections & details.
- b.Final structural technical specifications.