• Continue to develop the design to issue ERP documents for permitting and GMP preparation by the CM
  • Structural Framing Design
  • Advance the design of columns, beams, slabs, and lateral resisting elements.
  • Coordinate and advance the details
  • Design Production
  • Further the electronic documents showing the structural framing layout.
  • Coordinate structural framing with other disciplines.
  • Prepare Structural General Notes.
  • Create plan drawings for the following:
  • Foundations
  • Floor and roof framing plans
  • Prepare column and wall schedules if appropriate.
  • Provide elevations of Lateral resisting elements if appropriate.
  • Advance the detailing of structural conditions.
  • Generate building sections and elevations as appropriate.
  • Prepare long form technical specifications.
  • Task 3 Design Development Deliverables include:
  • Structural plans with major structural element types noted on plans.
  • Preliminary structural technical specifications.
  • Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.
  • Structural (HEES - TASK 3): The design concepts and framing systems have already been established for the foundations and framing layout.
  • Foundation Design: Continue coordination with the design team and the contractor. Construction Contract Administration scope for the ERP package will be submitted separately and not included as part of this scope.
  • Structural Framing Design
  • Finalize the structural design of the primary framing systems, incorporate information from GMP bid process
  • Advance the details for unique conditions, special structures and connections between new and existing structural members.
  • Develop strengthening details as required for modifications to existing structures
  • Detailed design of all girders, bents, columns, supports bearing details and perimeter panels.
  • Details of connections to existing structures
  • Detail design of roof framing.
  • Coordination of escalators.
  • Exterior wall support design.
  • Task 3 Construction Document Deliverables include:
  • Final structural building floor plans, sections & details.
  • Final structural technical specifications.

Page | 29