Continue to develop the design to issue ERP documents for permitting and GMP preparation by the CM
Structural Framing Design
Advance the design of columns, beams, slabs, and lateral resisting elements.
Coordinate and advance the details
Design Production
Further the electronic documents showing the structural framing layout.
Coordinate structural framing with other disciplines.
Prepare Structural General Notes.
Create plan drawings for the following:
Foundations
Floor and roof framing plans
Prepare column and wall schedules if appropriate.
Provide elevations of Lateral resisting elements if appropriate.
Advance the detailing of structural conditions.
Generate building sections and elevations as appropriate.
Prepare long form technical specifications.
Task 3 Design Development Deliverables include:
Structural plans with major structural element types noted on plans.
Preliminary structural technical specifications.
Construction Documents: The main objective of the Construction Document Phase will be to prepare documents which include sufficient detail required to construct the project.
Structural (HEES - TASK 3): The design concepts and framing systems have already been established for the foundations and framing layout.
Foundation Design: Continue coordination with the design team and the contractor. Construction Contract Administration scope for the ERP package will be submitted separately and not included as part of this scope.
Structural Framing Design
Finalize the structural design of the primary framing systems, incorporate information from GMP bid process
Advance the details for unique conditions, special structures and connections between new and existing structural members.
Develop strengthening details as required for modifications to existing structures
Detailed design of all girders, bents, columns, supports bearing details and perimeter panels.
Details of connections to existing structures
Detail design of roof framing.
Coordination of escalators.
Exterior wall support design.
Task 3 Construction Document Deliverables include:
Final structural building floor plans, sections & details.
Final structural technical specifications.
Page | 29