PROJECT SCOPE OF SERVICES – Scope Detail (HEES & ASSOCIATES – STRUCTURAL)
These Scope Details define the level of service and the processes involved, and describe the characteristics of the deliverables the consultant will produce while engaging in the tasks and Elements of Work listed in the Scope Outline above.
Schematic Design Documents – Schematic Design will be based on the approved layout/concept from the previous phase of work (Conceptual Programming & Layout). The objective will be to provide design studies and prepare presentation materials for each major component of the building development and to further establish the overall scope of the project by refining the program requirements to allow for preliminary budget confirmation by the Construction Manager for SRO approval. This phase will begin with the BIM model setup, development, and coordination between disciplines.
- Structural (HEES - TASK 3): The major building structural systems will be identified, analyzed, and coordinated with the architectural drawings and provided as a written structural narrative.
- a.Compilation of Data
- i.Confirm that all available relevant existing documentation and survey information has been obtained and reviewed.
- b.Foundation Design
- c.Structural Framing Design
- i.Review completed Geotechnical report.
- ii.Select the appropriate foundation system for the facility.
- iii.Preliminary coordination with existing, new, and relocated underground utilities.
- i.Select and advance the structural design of the selected framing systems.
- ii.Produce preliminary size and reinforcement quantity information for columns, beams and slabs.
- iii.Identify connection points between the existing and new structures.
- d.Design Production
- e.Generate wind pressures for all components.
- f.Identify the required specification sections and coordinate the list with other disciplines.
- Task 3 Schematic Design Deliverables include:
- a.Written structural narrative on proposed structural elements to be used.
- Design Development Documents and Early Release Packages (ERP)- The Design Development documents will refine and further develop the design concept and space planning established during the Schematic Design Phase.
- Structural (HEES - TASK 3): The design concepts and framing systems have already been established for the foundations and framing layout.
- a.Foundation Design ERP
- i.Advance the structural design of selected foundation system.
- ii.Coordinate foundation layout with all underground utilities and modify foundations as needed.
Page | 28