SCOPE DETAIL

  1. Structural (AECOM - TASK 2): The design concepts and framing systems have already been established for the foundations and framing layout.
  2. Foundation Design: Continue coordination with the design team and the contractor. Construction Contract Administration scope for the ERP package will be submitted separately and not included as part of this scope.
  3. Structural Framing Design
  4. Finalize the structural design of the primary framing systems, incorporate information from GMP bid process
  5. Advance the details for unique conditions, special structures, and connections between new and existing structural members.
  6. Develop strengthening details as required for modifications to existing structures
  7. Detailed design of all girders, bents, columns, supports bearing details and perimeter panels.
  8. Details of connections to existing structures
  9. Detailed design of station roof framing.
  10. Coordination of escalators.
  11. vili. Exterior wall support design.
  12. Task 2 Construction Document Deliverables include:
  13. Finalize foundation drawings and calculations, including blast fence foundation plans.
  14. Finalize all drawings and documents for the framing design.
  15. Finalize drawings for building framing foundations, columns, walls, structural elevations, details and sections.
  16. Finalize technical specifications, reports, calculations and required documentation for the structural work component.
  17. Permitting: Prepare drawings for the Plan Review submissions to the AHJ (Authorities having Jurisdiction) and respond to questions and provide supplemental information as required to complete the Plan Review process. Ensure bid documents are updated to reflect additional information provided to the AHJ. Attend meetings as required with the AHJ's to complete the plan review process.
  18. Bidding and GMP Support Services: Coordinate with the CM and respond to questions and requests for information arising from bidding the project:
  19. Provide supplemental drawings, respond to RFI's, issue addenda.
  20. Assist the CM with sub-contractor meetings
  21. Assist in price evaluation meetings

Excluded Requirements

  • All Construction Administration is excluded from this agreement and will be determined and added later in conjunction with the approved construction schedule and phasing plan.
  • Any hazardous materials surveying is excluded from this agreement.

Page | 26