Review completed Geotechnical report.
Select the appropriate foundation system for the facility.
Advance the structural design of selected foundation system.
Preliminary coordination with existing, new, and relocated underground utilities, and jet blast fence requirements to protect auto parking.
Select the bomb size and location to perform the analysis.
Present the analysis in report format with best practice recommendations to be incorporated into the design.
Scope of Services
November 9, 2021
Select and advance the structural design of the selected framing systems.
Produce preliminary size and reinforcement quantity information for columns, beams, and slabs.
Identify possible systems routings.
Identify connection points between the existing and new structures.
Further the electronic documents showing the structural framing layout.
Coordinate structural layout with other disciplines.
Start developing details pertaining to the structure.
Generate loading plan for all levels and roof including wind pressures for all components.
Identify the required specification sections and coordinate the list with other disciplines.
Task 2 Schematic Design Deliverables include:
Record in a memo format the review and findings of the existing documentation and survey information.
Schematic design/drawings of the foundation system for the facility.
Report on the Blast Mitigation including best practices recommendations.
Schematic drawings of the framing layout.
Schematic drawings showing structural details and preliminary load calculations.
…
Design Development Documents and Early Release Packages (ERP)- The Design Development documents will refine and further develop the design concept and space planning established during the Schematic Design Phase.
Civil Site Design ERP (AECOM): Continue to develop the design to issue ERP documents for permitting and GMP preparation by the CM. This will include development of the designs started in the previous task, along with the design of erosion control measures and technical specifications for the civil/site portion of the project. The civil/site plans will be updated to reflect the level of design as follows:
Utilities:
Water – prepare plan and profile drawings for relocation and submit for permitting through Manatee County and FDEP.
Sanitary Sewer – prepare plan and profile drawings, sanitary lift station design and details, and