PLOT DATE: 9/05/07 FRENSE: CEURAS
MAIN CHECKPOINT EQUIPMENT FLOOR PLAN - FINAL SCALE: 3/32"=1'-0"
ARN101A
COUNTS FOR QUEUNG ARE NOT INCLUDED IN THE COUNT OF RELOCATED STANCHIONS AND LAVI HARD PANELS. EXISTING QUEUNG SHALL BE RELOCATED TO MATCH PLAN. ANY ADDITIONAL STANCHIONS AND HARD PANELS THAT ARE NEEDED SHALL BE REQUESTED AT THAT TIME.
| EQUIPMENT AND FURNISHINGS MAIN TERMINAL MAIN CHECKPOINT - RELOCATED EQUIPMENT | ||||
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|---|---|---|---|
| TDC PODIUM | <40 | 2 | BY CONTRACTOR | - |
| OPERATOR CHAIR | <40 | 2 | BY CONTRACTOR | - |
| LAVI HARD PANELS | <40 | * 1 | BY CONTRACTOR | - |
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|---|---|---|---|
| SMITHS 6040aTIX w/ HSC | <110 | 1 | BY CONTRACTOR | |
| 6040aTIX 2'-0" INFEED ROLLER | <111 | 1 | BY CONTRACTOR | |
| 6040aTIX 6'-8" EXIT ROLLER | <112 | 1 | BY CONTRACTOR | |
| 6040aTIX 4'-0" EXTENSION ROLLER | <113 | 1 | BY CONTRACTOR | |
| SMITHS 6040aTIX AVS W/ AVS TABLE | <115 | 1 | BY CONTRACTOR | |
| MANUAL DIVERSION ROLLER (MDR) | <140 | 1 | BY CONTRACTOR | |
| AIT L3 ProVision | <200 | 1 | BY CONTRACTOR | |
| IMPLANT SCIENCES QS-B220 ETD | <205 | 2 | BY CONTRACTOR | |
| BLS (GENERIC) | <307 | 1 | BY CONTRACTOR | |
| ETD/BLS CABINET | <406 | 1 | BY CONTRACTOR | |
| ETD MOBILE CABINET | <408 | 1 | BY CONTRACTOR | |
| TDC PODIUM | <401 | 2 | BY CONTRACTOR | |
| OPERATOR CHAIR | <408 | 3 | BY CONTRACTOR | |
| 30"x 60" STAINLESS STEEL TABLE | <502 | 2 | BY CONTRACTOR | |
| BIN CART | <505 | 2 | BY CONTRACTOR | |
| WANDING MAT | <506 | 2 | BY CONTRACTOR | |
| BARRIER (1'-0") | <500 | 2 | BY CONTRACTOR | |
| ADA GATE - ACCESS GATE | <504 | 1 | BY CONTRACTOR | |
| LAVI STRAP STANCHION | <505 | * 1 BY CONTRACTOR BY OWNER/TSA | ||
| LAVI HARD PANELS | <506 | * 1 BY CONTRACTOR - | ||
MAIN TERMINAL MAIN CHECKPOINT - NEW (PROVIDED BY OWNER/TSA)
0 9/1/2021 ISSUE FOR CONSTRUCTION
MARK DATE DESCRIPTION
DESIGNING OFFICE: BETHESDA, MARYLAND
DESIGNED BY: CAMERON LOVELL, K2
DRAWN BY: CAMERON LOVELL, K2
CHECKED BY: DAVID BORGS, K2
SHEET TITLE
KEY PLAN
[F2]
U.S. DEPARTMENT OF HOMELAND SECURITY 601 SOUTH 12TH STREET, ARLINGTON VA 22202
B
A
K2 CONSTRUCTION CONSULTANTS, INC. 4330 East-West Highway, Suite 320, Bethesda, MD 20814 301.656.2228 | servicerequest@k2consulting.com www.k2consulting.com
4
5