PLOT DATE: 9/05/07
FRENSE: CEURAS
ARN101A
| EQUIPMENT AND FURNISHINGS MAIN TERMINAL MAIN CHECKPOINT - RELOCATED EQUIPMENT |
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|
| TDC PODIUM | <40 | 2 | BY CONTRACTOR | - |
|---|
| OPERATOR CHAIR | <40 | 2 | BY CONTRACTOR | - |
|---|
| LAVI HARD PANELS | <40 | * 1 | BY CONTRACTOR | - |
|---|
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|
| SMITHS 6040aTIX w/ HSC | <110 | 1 | | BY CONTRACTOR |
|---|
| 6040aTIX 2'-0" INFEED ROLLER | <111 | 1 | | BY CONTRACTOR |
|---|
| 6040aTIX 6'-8" EXIT ROLLER | <112 | 1 | | BY CONTRACTOR |
|---|
| 6040aTIX 4'-0" EXTENSION ROLLER | <113 | 1 | | BY CONTRACTOR |
|---|
| SMITHS 6040aTIX AVS W/ AVS TABLE | <115 | 1 | | BY CONTRACTOR |
|---|
| MANUAL DIVERSION ROLLER (MDR) | <140 | 1 | | BY CONTRACTOR |
|---|
| AIT L3 ProVision | <200 | 1 | | BY CONTRACTOR |
|---|
| IMPLANT SCIENCES QS-B220 ETD | <205 | 2 | | BY CONTRACTOR |
|---|
| BLS (GENERIC) | <307 | 1 | | BY CONTRACTOR |
|---|
| ETD/BLS CABINET | <406 | 1 | | BY CONTRACTOR |
|---|
| ETD MOBILE CABINET | <408 | 1 | | BY CONTRACTOR |
|---|
| TDC PODIUM | <401 | 2 | | BY CONTRACTOR |
|---|
| OPERATOR CHAIR | <408 | 3 | | BY CONTRACTOR |
|---|
| 30"x 60" STAINLESS STEEL TABLE | <502 | 2 | | BY CONTRACTOR |
|---|
| BIN CART | <505 | 2 | | BY CONTRACTOR |
|---|
| WANDING MAT | <506 | 2 | | BY CONTRACTOR |
|---|
| BARRIER (1'-0") | <500 | 2 | | BY CONTRACTOR |
|---|
| ADA GATE - ACCESS GATE | <504 | 1 | | BY CONTRACTOR |
|---|
| LAVI STRAP STANCHION | <505 | * 1 BY CONTRACTOR BY OWNER/TSA |
|---|
| LAVI HARD PANELS | <506 | * 1 BY CONTRACTOR - |
|---|
MAIN TERMINAL MAIN CHECKPOINT - NEW (PROVIDED BY OWNER/TSA)
0 9/1/2021 ISSUE FOR CONSTRUCTION
MARK DATE DESCRIPTION
DESIGNING OFFICE: BETHESDA, MARYLAND
DESIGNED BY: CAMERON LOVELL, K2
DRAWN BY: CAMERON LOVELL, K2
CHECKED BY: DAVID BORGS, K2
SHEET TITLE
KEY PLAN
[F2]
A
4
5