MAIN CHECKPOINT EQUIPMENT FLOOR PLAN - INITIAL SCALE: 3/32n = 1n - 0n
1. COUNTS FOR QUEUNG ARE NOT INCLUDED IN THE COUNT OF RELOCATED STANCHIONS AND LAVI HARD PANELS. EXISTING QUEUNG SHALL BE RELOCATED TO MATCH PLAN. ANY ADDITIONAL STANCHIONS AND HARD PANELS THAT ARE NEEDED SHALL BE REQUESTED AT THAT TIME.
| OWNER/TSA) | ||||
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|---|---|---|---|
| 6040aTiX 4'-0" EXTENSION ROLLER | <113 | 1 | BY CONTRACTOR | |
| 30"x 60" STAINLESS STEEL TABLE | <102 | 2 | BY CONTRACTOR | |
| BARRIER (2'-0") | <101 | 1 | BY CONTRACTOR | |
| BARRIER (3'-0") | <102 | 2 | BY CONTRACTOR | |
| DESCRIPTION | TAG | QUANTITY | RELOCATED | INSTALLED |
|---|---|---|---|---|
| SMITHS 6040aTIX w/ HSC | <10 | 4 | BY CONTRACTOR | - |
| 6040aTIX 2'-0" INFEED ROLLER | <11 | 4 | BY CONTRACTOR | - |
| 6040aTIX 6'-8" EXIT ROLLER | <12 | 4 | BY CONTRACTOR | - |
| 6040aTIX 4'-0" EXTENSION ROLLER | <13 | 6 | BY CONTRACTOR | - |
| SMITHS 6040aTIX AVS W/ AVS TABLE | <15 | 4 | BY CONTRACTOR | - |
| MANUAL DIVERSION ROLLER (MDR) | <40 | 4 | BY CONTRACTOR | - |
| AIT L3 ProVision | <20 | 2 | BY CONTRACTOR | - |
| WTMD CEIA | <210 | 3 | BY CONTRACTOR | - |
| IMPLANT SCIENCES QS-B220 ETD | <05 | 4 | BY CONTRACTOR | - |
| BLS (GENERIC) | <07 | 2 | BY CONTRACTOR | - |
| ETD/BLS CABINET | <406 | 2 | BY CONTRACTOR | - |
| ETD MOBILE CABINET | <406 | 2 | BY CONTRACTOR | - |
| TDC PODIUM | <404 | 8 | BY CONTRACTOR | - |
| OPERATOR CHAIR | <408 | 12 | BY CONTRACTOR | - |
| 30"x 72" STAINLESS STEEL TABLE | <500 | 6 | BY CONTRACTOR | - |
| BENCH | <50 | 3 | BY CONTRACTOR | - |
| BIN CART | <205 | 4 | BY CONTRACTOR | - |
| WANDING MAT | <500 | 4 | BY CONTRACTOR | - |
| BARRIER (1'-0") | <500 | 1 | BY CONTRACTOR | - |
| BARRIER (2'-0") | <501 | 5 | BY CONTRACTOR | - |
| BARRIER (3'-0") | <502 | 2 | BY CONTRACTOR | - |
| BARRIER (4'-0") | <503 | 2 | BY CONTRACTOR | - |
| ADA GATE - ACCESS GATE | <504 | 6 | BY CONTRACTOR | - |
| LAVI STRAP STANCHION | <505 | * 1 | BY CONTRACTOR | - |
| LAVI HARD PANELS | <506 | * 1 | BY CONTRACTOR | - |
EQUIPMENT AND FURNISHINGS MAIN TERMINAL MAIN CHECKPOINT - RELOCATED EQUIPMENT
0 9/1/2021 ISSUE FOR CONSTRUCTION
MARK DATE DESCRIPTION
DESIGNING OFFICE: BETHESDA, MARYLAND
DESIGNED BY: CAMERON LOVELL, K2
DRAWN BY: CAMERON LOVELL, K2
CHECKED BY: DAVID BORGES, K2
KEY PLAN
PILOT SCALE: 11 PAPER SCALE: 22.34 LAST SAVED BY: Lenal Conner SAVE DATE: 9/1/2021 SHEET SET: Issue For Construction SHEET SUEGES: Architectural