CONTRACTOR SHALL COORDINATE DELIVERY PATH, FLOOR PROTECTION, AND DELIVERY TIMES WITH THE AIRPORT. CONTRACTOR SHALL COORDINATE WITH DESIGNER/STRUCTURAL ENGINEER TO EVALUATE THE STRUCTURAL INTEGRITY OF THE DELIVERY PATH AND FINAL POSITION. RETURNED TO OWNER.
EQUIPMENT REFERENCE POINT
RE: 1/APD101 FOR EXISTING EQUIPMENT.
THE DESIGN IS BASED ON THE CHECKPOINT REQUIREMENTS AND PLANNING GUIDE (CRPG) REVISION 0 DATED 12/17/2018.
UTILIZE EXISTING STANCHIONS TO PROVIDE THE CONFIGURATION SHOWN. PROJECT SPONSOR TO SUPPLY ADDITIONAL STANCHIONS WHERE NECESSARY.
PROVIDE NEW EQUIPMENT. RE: ARN101.
RELOCATED EQUIPMENT. RE: ARN101.
SMITHS 6040ATIX AT2 INCLUDES ONE INFEED ROLLER, ONE SCANNER UNIT, ONE HSC, AND ONE 6'-8" EXIT ROLLER.
SARASOTA
BRADENTON
INTERNATIONAL
LOCAL TSA AND PROJECT SPONSOR SHALL DETERMINE THE AVAILABILITY OF ALL NEW EQUIPMENT PRIOR TO THE WORK (RE: ARN101), INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
ETD-8LS COMBINATION MOBILE CABINET
EXTENSION ROLLERS
TDC PODIUMS
ADA GATES & BARRIERS
COMPOSURE BENCHES
WHERE "AVAILABLE": LOCAL TSA SHOW PROCURE VIA THE REMAG PROCESS AND INSTALL CONTRACTOR IS NOT RESPONSIBLE FOR PROCUREMENT. WHERE "UNAVAILABLE": PROJECT SPONSOR SHALL PROCUREMENT FROM VENDOR AND INSTALL CONTRACTOR WILL UTILIZE EXISTING EQUIPMENT DURING INTERIM PERIOD WHILE NEW EQUIPMENT SHIPS FROM VENDOR.