2
3
4
5
APN101
EQUIPMENT REFERENCE POINT
CONTRACTOR SHALL COORDINATE DELIVERY PATH, FLOOR PROTECTION, AND DELIVERY TIMES WITH THE AIRPORT. CONTRACTOR SHALL COORDINATE WITH DESIGNER/STRUCTURAL ENGINEER TO EVALUATE THE STRUCTURAL INTEGRITY OF THE DELIVERY PATH AND FINAL POSITION. RETURNED TO OWNER.
RE: 1/APE101 FOR EXISTING EQUIPMENT.
UTILIZE EXISTING STANCHIONS TO PROVIDE THE CONFIGURATION SHOWN. PROJECT SPONSOR TO SUPPLY ADDITIONAL STANCHIONS WHERE NECESSARY.
PROVIDE NEW EQUIPMENT. RE: ARN101.
RELOCATED EQUIPMENT. RE: ARN101.
SMITHS 6040ATIX AT2 INCLUDES ONE INFEED ROLLER, ONE SCANNER UNIT, ONE HSC, AND ONE 6'-8" EXIT ROLLER.
LOCAL TSA AND PROJECT SPONSOR SHALL DETERMINE THE AVAILABILITY OF ALL NEW EQUIPMENT PRIOR TO THE WORK (RE: ARN101), INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
ETD-BLS COMBINATION MOBILE CABINET
EXTENSION ROLLERS
TDC PODIUMS
ADA GATES & BARRIERS
COMPOSURE BENCHES
WHERE "AVAILABLE": LOCAL TSA SHOW PROCURE VIA THE REMAG PROCESS AND INSTALL. CONTRACTOR IS NOT RESPONSIBLE FOR PROCUREMENT. WHERE "UNAVAILABLE": PROJECT SPONSOR SHALL PROCURE FROM VENDOR AND INSTALL. CONTRACTOR WILL UTILIZE EXISTING EQUIPMENT DURING INTERIM PERIOD WHILE NEW EQUIPMENT SHIPS FROM VENDOR.
A. THE DESIGN IS BASED ON THE CHECKPOINT REQUIREMENTS AND PLANNING GUIDE (CRPG) REVISION 1 DATED 3/10/2020.
SARASOTA
BRADENTON
INTERNATIONAL
AIRPORT CATEGORY
l