MAIN CHECKPOINT FLOOR PLAN - DEMOLITION
SCALE: 3/32" = 1 - 0"
D.EQUIPMENT NOT NOTED IS EXISTING TO REMAIN.
C.PATCH AND REPAIR ALL AFFECTED FLOORS PER AIRPORT STANDARDS
B.ALL DASHED EQUIPMENT TO BE RELOCATED OR REMOVED AND RETURNED TO OWNER.
A.SECURITY SCREENING AND ANCILLARY EQUIPMENT COULD HAVE BEEN REMOVED, RELOCATED, OR ADDED SINCE EXISTING CONDITIONS OF THE CHECKPOINT WERE DOCUMENTED. THE CONTRACTOR SHOULD FIELD VERIFY EQUIPMENT AND CURRENT LOCATIONS AND NOTIFY DESIGNER OF ANY VARIANCES PRIOR TO THE START OF CONSTRUCTION SO THAT DESIGNER CAN DETERMINE IF THERE ARE ANY IMPACTS TO THE DESIGN.
REUSE STANCHIONS AS NECESSARY. SALVAGE EXCESS STANCHIONS. PROVIDE TO LOCAL TSA FOR STORAGE.