Bill Mariotti Site Dev. co., Inc
4559 Mariotti Court
ENGINEER'S SUPPLEMENTAL INSTRUCTION (ESI)
Date: May 20, 2021
ESI No.: 001
Date: May 20, 2021 EST No.: 001
To: Magnum Builders
CC: Mr. Mark Jansen, P.E.
Shop Drawing: N/A
Specifications: N/A
Other: N/A
Subject:
I his ESI covers revisions made to the southernmost pond to create a wetland mitigation site. The following sheets are revised:
C200 - Demolition Plan:
- Coordinate final canopy designs with USA Shade. USA shade plans shall govern.
- Added existing pavement removal on rental parking lot.
- Added pavement marking removal on rental parking lot.
- Added parking island removal on rental parking lot.
- Added sanitary manhole adjustment on rental parking lot.
- Added high-mast light removal for relocation on rental parking lot. See upcoming electrical plans in future ESI
- Added 1" pavement milling on rental parking lot.
- Revised the limits of clearing/grubbing and topsoil stripping on long-term parking lot.
- Revised the number of tree removal on long-term parking lot.
C201 - Demolition Plan:
- Revised the limits of clearing/grubbing and topsoil stripping on long-term parking lot.
- Revised the number of trees to be removed on long-term parking lot.
- C205 - Geometry Plan:
- Revised the number of trees to be removed.
- C300 – Geometry Plan:
- Added new parking canopy on rental parking lot. Coordinate with USA Shade for final plans.
- Added pedestrian canopy on rental parking lot. Coordinate with USA Shade for final plans.
- Added gate and hardware on rental parking lot.
- Added parking islands on rental parking lot.
- Added asphalt pavement on rental parking lot.
- Added pavement marking on rental parking lot.
- Added sanitary manhole adjustment on rental parking lot.
- Added relocated high-mast light pole in rental parking lot. See upcoming electrical plans in future ESI.
- Added 8" pipe to connect to existing storm manhole on rental parking lot.
- Added traffic rated Nyloplast structure in rental parking lot.