DESIGN/ENGINEERING
SCOPE OF WORK
Design to IBC FBC2020, 160 mph wind speed, 0-pound snow load.
- VPS's proposal for the Project includes the following:
- One (1) Preliminary Design Concept Refinement.
- Foundations and anchor bolt design by VPS for our structure.
- Design and engineering for tensile membrane canopy systems.
- Patterning for fabrication of architectural membrane.
- We will include limited assistance for any MEP requirements which are to be supplied and installed by others.
- Design and Engineering support for building department approval.
- Wet sealed design drawings and calculations by licensed Professional Engineer.
- VPS's proposal for the Project does not include the following:
- We exclude design or engineering of any mechanical, electrical, lighting, sprinkler system, speaker systems, lightning protection systems, or hydrology design for guttering system.
- Design or engineering of other site work or general contractor's work.
FURNISHED MATERIALS
VPS's proposal for the Project includes the following:
- Fabricated PVC architectural membrane. Color to be white.
- Finish 3-part painted structural steel directly associated with tensile membrane structure down to and including base plates. All field connections to be bolted – No Field Welding.
- Anodized aluminum clamp system with galvanized fasteners as required.
- Gutters, closures, and downspouts.
- Provision of our standard one (1) year workmanship warranty and the fabric manufacturer's standard pass-thru material warranty. Our standard workmanship warranty is for the tensile membrane components we supply, with the exception of the steel corrosion protection, which will only be a one (1) year warranty. Because of surety requirements, any performance bond, that may be required, will cover only the first year of the warranty. The warranty will be a separate document between VPS and the Owner. Upon completion of our work, VPS will execute the warranty.
- Maintenance documents.
- Use tax.
- VPS's proposal for the Project does not include the following:
- Performance or payment bonds, building permits or fees of any kind.
- Any site demolition, modifications, or repairs to other's buildings, landscaping, or restoration work.
- Any site surveys.
- Any mechanical, electrical, lighting, sprinkler system, speaker systems, lightning protection systems, or attachments to our work (limited coordination only).
- All attachments to wall or roof for structural support.
- Any AESS requirements for steel fabrication or erection.
- Any mockups.
- Buy America, Fly America, and USA flagships.
2