Location: 198, 202 and 210 South Hope Chapel Road P/F Major Subdivision for 9 Single Family Lots, 1 AH Lot and 1 Stormwater Basin Lot Engineer: Civil Core Consulting Attorney: Salvatore Alfieri, Esq. Date Complete: 6/18/26 Hearing Status: Initial Testimony
Location: 109 North County Line Road Amended Site Plan Approval to Permit Additional Restaurant Use on the Property Engineer: Civil Core Consulting Attorney: Salvatore Alfieri, Esq. Date Complete: 8/10/26 Hearing Status: Initial Testimony
Location: 45 Pitney Lane P/F Major Site Plan for a Change of Use from Residential to House of Worship Engineer: Civil Core Consulting Attorney: Adam Pfeffer, Esq. Date Complete: 5/1/26 Hearing Status: Initial Testimony
Location: 31 and 29 Buckingham Drive P/F Major Site Plan for a 4,324 Square Foot Shul and Permitted Accessory Structure Engineer: Haler Consulting Attorney: Donna Jennings, Esq. Date Complete: 9/9/26 Hearing Status: Initial Testimony
Location: 233 Grawntown Road Amended Major Subdivision and Site Plan to Accommodate Stormwater Management Requirements Engineer: Professional Design Services Attorney: Adam Pfeffer, Esq. Date Complete: 5/21/26 Hearing Status: Initial Testimony
Location: Jackson Mills Road
P/F Major Site Plan for a 23,657 Square Foot Mikhah Engineer: Professional Design Services Attorney: Salvatore Alfieri, Esq. Date Complete: 8/10/26 Hearing Status: Initial Testimony