===== PAGE 1 =====
## PROJECT OVERVIEW
## Daily Traffic Volumes
2024: 7,000
2050: 32,000
## Purpose and Need
Accommodate future transportation demand
Enhance safety
## Key Design Features
Modify the I-75 interchange to a Diverging Diamond Interchange (DDI) concept
Construct braided ramps southbound I-75
Reconstruct I-75 bridges
Add capacity along Moccasin Wallow Road
Add stormwater ponds
Contact Information:
Nicole Harris, PE
FDOT District One Project Manager
863-519-2335
Nicole.Harris@dot.state.fl.us
## Safety Conditions
23 Serious Injury
69th St