6. Conclusion.....49

Table of Figures

Figure 1: US 27 Study Corridor.....2 Figure 2: US 27 Number of Lanes and Functional Classification.....6 Figure 3: Existing 2023 AADT and Daily Truck Factor.....7 Figure 4: US 27 Crash Summary (2019-2023).....8 Figure 5: Bicycle and Pedestrian Crash Severity Trends along US 27 (2019-2023).....9 Figure 6: Truck Crash Locations along US 27 (2019-2023).....9 Figure 7: US 27 Crash Heat Map (2019-2023).....11 Figure 8: US 27 Study Corridor Land Use Map.....13 Figure 9: US 27 Proximity to Freight Activity Centers and Freight Generators.....15 Figure 10: FDOT District One Truck Parking Utilization.....16 Figure 11: Existing Typical Section Diagram.....17 Figure 12: FDOT Context Classification on the US 27 Study Corridor.....18 Figure 13: Map of Existing 2015 Floodplains.....21 Figure 14: Map of Existing Bridges.....22 Figure 15: Map of Detour Routes.....29 Figure 16: 2045 Cost Feasible Model Adjacent Projects.....31 Figure 17: 2045 No-Build Peak Hour Peak Direction Level of Service (LOS).....33 Figure 18: 2045 No-Build Daily Traffic (AADT).....34 Figure 19: 2045 No-Build Daily Traffic (Truck Volume).....35 Figure 20: 2045 Build Alternative - General-Purpose Lane Widening AADT.....39 Figure 21: 2045 Build Alternative - General-Purpose Lane Widening Peak Hour Peak Direction LOS.....40 Figure 22: Build Alternative Lanes (Each Direction).....43

Table of Tables

Table 1: Segment Crash Rates along US 27 (2019 – 2023) ..... 10 Table 2: Estimated Economic Loss from All Crash Types (KABCO) along US 27 (2019-2023) ..... 10 Table 3: Summary of WBIDs and Impairment Status ..... 19 Table 4: Existing Cross Culverts ..... 20 Table 5: Existing Bridge Geometry ..... 23 Table 6: Summary of Existing Bridge Conditions ..... 23 Table 7: Federally Protected Species ..... 24 Table 8: State Protected Species ..... 24 Table 9: Non-Listed Protected Species ..... 25 Table 10: FLUCCS Level 2 Wetland Inventory ..... 25 Table 11: Detour Routes and Additional Travel Time (Mins) and Distance (Miles) ..... 28 Table 12: No-Build 2045 Level of Service (LOS) ..... 32 Table 13: Improvements for Sections on US 27 ..... 37 Table 14: Level of Service (LOS) analysis along US 27 for General-Purpose Lane Widening Alternative ..... 38 Table 15: Planning-Level Construction Cost Estimates and ROW Impacts ..... 42 Table 16: 2045 Comparison of the Build and No-Build Alternatives Summary ..... 44

vi