6. Conclusion.....49
Figure 1: US 27 Study Corridor.....2
Figure 2: US 27 Number of Lanes and Functional Classification.....6
Figure 3: Existing 2023 AADT and Daily Truck Factor.....7
Figure 4: US 27 Crash Summary (2019-2023).....8
Figure 5: Bicycle and Pedestrian Crash Severity Trends along US 27 (2019-2023).....9
Figure 6: Truck Crash Locations along US 27 (2019-2023).....9
Figure 7: US 27 Crash Heat Map (2019-2023).....11
Figure 8: US 27 Study Corridor Land Use Map.....13
Figure 9: US 27 Proximity to Freight Activity Centers and Freight Generators.....15
Figure 10: FDOT District One Truck Parking Utilization.....16
Figure 11: Existing Typical Section Diagram.....17
Figure 12: FDOT Context Classification on the US 27 Study Corridor.....18
Figure 13: Map of Existing 2015 Floodplains.....21
Figure 14: Map of Existing Bridges.....22
Figure 15: Map of Detour Routes.....29
Figure 16: 2045 Cost Feasible Model Adjacent Projects.....31
Figure 17: 2045 No-Build Peak Hour Peak Direction Level of Service (LOS).....33
Figure 18: 2045 No-Build Daily Traffic (AADT).....34
Figure 19: 2045 No-Build Daily Traffic (Truck Volume).....35
Figure 20: 2045 Build Alternative - General-Purpose Lane Widening AADT.....39
Figure 21: 2045 Build Alternative - General-Purpose Lane Widening Peak Hour Peak Direction LOS.....40
Figure 22: Build Alternative Lanes (Each Direction).....43
Table 1: Segment Crash Rates along US 27 (2019 – 2023) ..... 10
Table 2: Estimated Economic Loss from All Crash Types (KABCO) along US 27 (2019-2023) ..... 10
Table 3: Summary of WBIDs and Impairment Status ..... 19
Table 4: Existing Cross Culverts ..... 20
Table 5: Existing Bridge Geometry ..... 23
Table 6: Summary of Existing Bridge Conditions ..... 23
Table 7: Federally Protected Species ..... 24
Table 8: State Protected Species ..... 24
Table 9: Non-Listed Protected Species ..... 25
Table 10: FLUCCS Level 2 Wetland Inventory ..... 25
Table 11: Detour Routes and Additional Travel Time (Mins) and Distance (Miles) ..... 28
Table 12: No-Build 2045 Level of Service (LOS) ..... 32
Table 13: Improvements for Sections on US 27 ..... 37
Table 14: Level of Service (LOS) analysis along US 27 for General-Purpose Lane Widening Alternative ..... 38
Table 15: Planning-Level Construction Cost Estimates and ROW Impacts ..... 42
Table 16: 2045 Comparison of the Build and No-Build Alternatives Summary ..... 44
vi