Table 14: Level of Service analysis along US 27 for General-Purpose Lane Widening Alternative
| FROM | TO | MAX PEAK HOUR VOLUME | SERVICE VOLUME CAPACITY LOS D | MAX V/C RATIO RANGE | PEAK HOUR-LOS |
|---|
| Highlands/Glades County Line | Lake Henry Dr | 1,850 | 1,580-2000 | 0.95 | C |
|---|
| Lake Henry Dr | Touchton Rd | 1,600 | 1,580 | 1.01 | E |
|---|
| Touchton Rd | Desoto Dr | 3,100 | 3,020-4,040 | 0.88 | C |
|---|
| Desoto Dr | Lakeview Dr | 3,100 | 3,020 | 0.99 | D |
|---|
| Lakeview Dr | W Main St | 3,200 | 3,020-4,040 | 0.96 | C |
|---|
| W Main St | Palmetto St | 3,000 | 3,020 | 0.99 | D |
|---|
| Palmetto St | County Rd | 3,150 | 3,020 | 1,04 | E |
|---|
| County Rd | Highlands/Polk County Line | 3,950 | 4,040 | 0.97 | C |
|---|
The Crash Reduction Factors (CRF) developed by FDOT were applied to proposed improvements in the study area. FDOT Safety Office Crash Reduction Analysis Safety Hub (CRASH) program is a safety improvement tools used by FDOT to conduct benefit-cost analyses and calculate CRF (https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/qa/tools/crfguide.pdf?sfvrsn=2e360f88_2). The improvement in the Build Alternative decreases the total crashes by 13%. However, the improvement increases sideswipe, fixed-object, wrong-way and pedestrian crashes.
38
Lake Henry Dr 1,850 1,580-2000 0.95
Touchton Rd Desoto Dr 3,100 3,020-4,040 0.88
Desoto Dr Lakeview Dr 3,100 3,020 0.99
Lakeview Dr W Main St 3,200 3,020-4,040 0.96
W Main St Palmetto St 3,000 3,020 0.99
County Rd 3.950 4,040 0.97