DISTRICT ONE
HIGHLANDS COUNTY Feasibility Study
magnified with the recent impacts from Hurricane Ian. Due to significant inland flooding, and with portions of I-75 impassable during the aftermath of the storm, the lack of alternate evacuation and emergency management corridors through the Heartland region was evident.
Table 11: Detour Routes and Additional Travel Time (Mins) and Distance (Miles
RoadFromToAlt. Route DescriptionDirect Travel TimeDirect DistanceAlt. Travel TimeAlt. DistanceAdd'l Travel TimeAdd'l Distance
US 27SR 64SR 66SR 64 to SR 601614.24644.93030.7
US 27SR 66SR 70US 98 to SR 701716.87772.46055.6
US 27SR 70CR 74SR 70 to SR 31 to CR 74 / Bermont Rd1819.97978.86758.9
28