# Highlands County Feasibility Study Public Meeting September 17, 2024
FPID #: 449503-1
===== PAGE 2 =====
## WHY A HIGHLANDS COUNTY FEASIBILITY STUDY
Regional Growth
• Centrally located between major metropolitan areas
• Proactively planning to accommodate future growth
Safety and Mobility Challenges
• Increased truck traffic
○ Conflicts with pedestrians/bicycles
• Limited evacuation and detour routes
EVACUATION
ROUTE
Urban Areas 0 5 10 20 Miles
===== PAGE 3 =====
## FEASIBILITY STUDY
DISTRICT ONE
## Highlands County FEASIBILITY STUDY FPID: 449503-1
SEPTEMBER 2024 DRAFT
## Scope:
US 27 from CR 17 to SR 17 in Highlands County
Assess need for future improvements within Highlands County with a focus on:
Safety to identify high crash locations
Traffic to evaluate capacity additions
Freight
movement
Alternative route for detours and evacuation
Local plan review to ensure consistency
===== PAGE 4 =====
## Highlands County Feasibility Study Findings
POPULATION TRENDS
Highlands County is expected to see a 54% increase in population.
SAFETY
12 miles of US 27 have crash rates above the statewide rate.
FREIGHT
US 27 serves as a major freight corridor carrying up to 43% truck traffic.
EVACUATION ROUTE
ROUTE DE TOUR
EVACUATION/DETOURS
Limited parallel facilities to US 27 exist. Potential 67-minute detour to the nearest alternative route. TRAFFIC CONGESTION
Multiple segments of US 27 have more vehicles (up to 20% more) than can be accommodated.
===== PAGE 5 =====
## FUTURE YEAR BUILD OUT CONSIDERATIONS
• Portions of US 27 will be at or near capacity in 2045
○ Increased truck traffic
• Adding lanes to US 27 will not fix the problem:
New development will erode capacity initially gained from additional lanes
Impacts up to 304 parcels
Estimated project cost: $120 million
===== PAGE 6 =====
## SAFETY
Most crashes are in urbanized areas (Sebring and Avon Park)
• The fatal crash percentage is four times the national average
○ Lack of continuous bicycle/pedestrian infrastructure identified as a contributing factor
• Projected crashes with an additional lane:
TOTAL CRASHES DOWN
WRONG-WAY CRASHES UP
PEDESTRIAN CRASHES UP
===== PAGE 7 =====
## EVACUATION AND DETOURS
Regional transportation network does not have the capacity to handle evacuation traffic
- Lengthy detours if portions of US 27 are closed
DETOUR AND EVACUATION ROUTES
DETOUR 1: SR 64 TO SR 66
Additional Travel Time (mins)
30
Additional Distance (miles)
30.7
## DETOUR 2: US 98 TO SR 70
Additional Travel Time (mins)
60
Additional Distance (miles)
55.6
## DETOUR 3: SR 70 TO SR 31 to CR 74
Additional Travel Time (mins)
67
Additional Distance (miles)
58.9
===== PAGE 8 =====
## FEASIBILITY STUDY RECOMMENDATIONS
DISTRICT ONE
Highlands County
FEASIBILITY STUDY
FPID: 449503-1
SEPTEMBER 2024 DRAFT
PD&E Study
from SR 66
to US 98
PD&E Study
from SR 70
to SR 66
Mobility Analysis
===== PAGE 9 =====
## FEASIBILITY STUDY > RECOMMENDATIONS
## PD&E Study from SR 66 to US 98
## The need for the project is based on:
LAND USE CHANGES
TRAFFIC
CONGESTION
SAFETY
===== PAGE 10 =====
## FEASIBILITY STUDY > RECOMMENDATIONS
## PD&E Study from SR 70 to SR 66
The need for the project is based on:
NETWORK RESILIENCY
EMERGENCY EVACUATION
FREIGHT MOBILITY
===== PAGE 11 =====
## 祝 🌙 🎉
Identify operational improvements on US 27
Integrated adjacent project coordination
Setup for future change in character
## Mobility Analysis
===== PAGE 12 =====
## Community Engagement
## September – 2024
Highlands County Feasibility Study Public Meeting:
• In Person – September 17^{th}
• Virtual – September 19^{th}
## November 2024 – May 2025
Visioning Workshops
• In Person & Virtual
• Four Locations: Two PD&Es & Two Mobility Analysis
Visioning Workshops
## Workshop Locations
Lake Wales
Sebring
Wauchula
PD&E Study from
SR 66 to US 98
Arcadia
PD&E Study from
SR 70 to SR 66
Mobility Analysis
===== PAGE 13 =====
## Next Steps
## 目
PD&E SR 70 to SR 66 Visioning Workshop
In-Person - November 19, 2024
Turner Agri-Civic Center, 2250 NE Roan St, Arcadia, FL 34266
Virtual Self-Guided - November 20 – December 4, 2024
PD&E SR 66 to US 98 Visioning Workshop
☐ In-Person / Virtual – Early 2025 (Location and Dates: TBD)
Mobility Analysis Visioning Workshops
☐ In-Person / Virtual – Spring 2025 (Location and Dates: TBD)
===== PAGE 14 =====
## For Project Information Contact:
David Long, Project Manager
(813) 334-7056
David.Long@dot.state.fl.us
Project Website:
https://www.swflroads.com/proj
===== PAGE 15 =====
FDOT
## THERE IS MORE THAN ONE WAY TO DRIVING BUZZED
Distracted driving is just as dangerous as drunk driving. Keep your eyes on the road, not on your phone.