===== PAGE 1 =====
Image
# Highlands County Feasibility Study Public Meeting September 17, 2024 FPID #: 449503-1 ===== PAGE 2 ===== ## WHY A HIGHLANDS COUNTY FEASIBILITY STUDY Regional Growth • Centrally located between major metropolitan areas • Proactively planning to accommodate future growth Safety and Mobility Challenges • Increased truck traffic ○ Conflicts with pedestrians/bicycles • Limited evacuation and detour routes
Image
EVACUATION ROUTE Urban Areas 0 5 10 20 Miles
Image
===== PAGE 3 ===== ## FEASIBILITY STUDY
Image
DISTRICT ONE ## Highlands County FEASIBILITY STUDY FPID: 449503-1
Image
SEPTEMBER 2024 DRAFT ## Scope: US 27 from CR 17 to SR 17 in Highlands County Assess need for future improvements within Highlands County with a focus on:
Image
Safety to identify high crash locations
Image
Traffic to evaluate capacity additions
Image
Freight movement
Image
Alternative route for detours and evacuation
Image
Local plan review to ensure consistency ===== PAGE 4 ===== ## Highlands County Feasibility Study Findings
Image
POPULATION TRENDS Highlands County is expected to see a 54% increase in population.
Image
SAFETY 12 miles of US 27 have crash rates above the statewide rate.
Image
FREIGHT US 27 serves as a major freight corridor carrying up to 43% truck traffic. EVACUATION ROUTE
Image
ROUTE DE TOUR EVACUATION/DETOURS Limited parallel facilities to US 27 exist. Potential 67-minute detour to the nearest alternative route. TRAFFIC CONGESTION
Image
Multiple segments of US 27 have more vehicles (up to 20% more) than can be accommodated. ===== PAGE 5 ===== ## FUTURE YEAR BUILD OUT CONSIDERATIONS • Portions of US 27 will be at or near capacity in 2045 ○ Increased truck traffic • Adding lanes to US 27 will not fix the problem: New development will erode capacity initially gained from additional lanes Impacts up to 304 parcels Estimated project cost: $120 million
Image
===== PAGE 6 ===== ## SAFETY Most crashes are in urbanized areas (Sebring and Avon Park) • The fatal crash percentage is four times the national average ○ Lack of continuous bicycle/pedestrian infrastructure identified as a contributing factor • Projected crashes with an additional lane: TOTAL CRASHES DOWN WRONG-WAY CRASHES UP PEDESTRIAN CRASHES UP
Image
===== PAGE 7 ===== ## EVACUATION AND DETOURS Regional transportation network does not have the capacity to handle evacuation traffic - Lengthy detours if portions of US 27 are closed DETOUR AND EVACUATION ROUTES
DETOUR 1: SR 64 TO SR 66
Additional Travel Time (mins)30
Additional Distance (miles)30.7
## DETOUR 2: US 98 TO SR 70
Additional Travel Time (mins)60
Additional Distance (miles)55.6
## DETOUR 3: SR 70 TO SR 31 to CR 74
Additional Travel Time (mins)67
Additional Distance (miles)58.9
Image
===== PAGE 8 ===== ## FEASIBILITY STUDY RECOMMENDATIONS DISTRICT ONE Highlands County FEASIBILITY STUDY FPID: 449503-1
Image
SEPTEMBER 2024 DRAFT PD&E Study from SR 66 to US 98
Image
PD&E Study from SR 70 to SR 66 Mobility Analysis
Image
===== PAGE 9 ===== ## FEASIBILITY STUDY > RECOMMENDATIONS ## PD&E Study from SR 66 to US 98 ## The need for the project is based on:
Image
LAND USE CHANGES
Image
TRAFFIC CONGESTION SAFETY
Image
Image
===== PAGE 10 ===== ## FEASIBILITY STUDY > RECOMMENDATIONS ## PD&E Study from SR 70 to SR 66
Image
The need for the project is based on: NETWORK RESILIENCY
Image
EMERGENCY EVACUATION FREIGHT MOBILITY
Image
Image
===== PAGE 11 ===== ## 祝 🌙 🎉 Identify operational improvements on US 27 Integrated adjacent project coordination Setup for future change in character ## Mobility Analysis
Image
===== PAGE 12 =====
Image
## Community Engagement ## September – 2024 Highlands County Feasibility Study Public Meeting: • In Person – September 17^{th} • Virtual – September 19^{th} ## November 2024 – May 2025 Visioning Workshops • In Person & Virtual • Four Locations: Two PD&Es & Two Mobility Analysis Visioning Workshops ## Workshop Locations Lake Wales
Image
Sebring Wauchula PD&E Study from SR 66 to US 98
Image
Arcadia
Image
PD&E Study from SR 70 to SR 66
Image
Mobility Analysis
Image
===== PAGE 13 ===== ## Next Steps ## 目 PD&E SR 70 to SR 66 Visioning Workshop In-Person - November 19, 2024 Turner Agri-Civic Center, 2250 NE Roan St, Arcadia, FL 34266 Virtual Self-Guided - November 20 – December 4, 2024 PD&E SR 66 to US 98 Visioning Workshop ☐ In-Person / Virtual – Early 2025 (Location and Dates: TBD) Mobility Analysis Visioning Workshops ☐ In-Person / Virtual – Spring 2025 (Location and Dates: TBD) ===== PAGE 14 ===== ## For Project Information Contact: David Long, Project Manager (813) 334-7056 David.Long@dot.state.fl.us Project Website: https://www.swflroads.com/proj
Image
===== PAGE 15 ===== FDOT ## THERE IS MORE THAN ONE WAY TO DRIVING BUZZED
Image
Distracted driving is just as dangerous as drunk driving. Keep your eyes on the road, not on your phone.