E-ONE HP95 Mid Mount Overall Length Overall Width Overall Body Height Min Body Ground Clearance Track Width Lock-to-lock time Max Wheel Angle 47.750ft 8.333ft 11.000ft 1.393ft 8.333ft 6.00s 45.00°

NO. REVISION DATE BY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ENGINEER AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF THE ENGINEER.

Civil Core Consulting Civil Core Consulting, LLC 1969 RUTGERS UNIVERSITY BLVD. LAKEWOOD, NJ 08701

NJ CERTIFICATE OF AUTHORIZATION NO. 24GA28399400

PROJECT: PRELIMINARY/FINAL MAJOR SUBDIVISION FOR 198, 202 & 210 SOUTH HOPE CHAPEL RD LOCATION: BLOCK 20701, LOT 12, 13, & 14 TAX MAP SHEET 207 DATED JUNE 2002 TOWNSHIP OF JACKSON OCEAN COUNTY NEW JERSEY

DRAWING TITLE: CIRCULATION PLAN

PROJECT NO. 23184 DATE 7/20/2025 DRAWN BY TP/HH CHECKED BY YP

AS NOTED SCALE

LICENSED PROFESSIONAL ENGINEER NJ LICENSE NO: GE53593

YOSEF PORTNOY