← Back to document 405

AI review — page 4

claude-opus-4-8 · prompt v7 · 2026-08-21T10:44:33+00:00 · applied: yes · changed: yes

Screenshot sent to the model (reading-order tags burned on)

Annotated page 4

Instructions (system prompt)

The screenshot has annotations burned onto it that are NOT part of the document:
- a small red numbered tag at the top-left corner of each item, showing that item's position in the OCR-determined reading order (the same order the items appear in the json data);
- a red-and-white dotted outline around each item, showing the area the OCR detected for that content block.
Use the tags and outlines to see the detected reading order and item boundaries directly on the page, and judge that sequence against how a human would naturally read it. Ignore the annotations when checking text fidelity — they overlay the content, they are not content.

For the given screenshot of a PDF's page and the attached json data, I want you to perform the following tasks in order...

Review the reading order set out in the json data and compare to what a natural reading order for that of a human would be by looking at the screenshot. Decide on any changes and re-arrange the items for the most logical reading order.
Look at all text for each item and correct any extraction errors like missing words, spelling mistakes etc.
Look at each item in the JSON and ensure that the OCR process has identified the item as the correct type: text, list item etc.
Look for any text that duplicates: if two items next to each other contain the exact same text but the text only appears once on the screenshot, one of them is an extraction error — keep the item whose box matches where the text is visible and flag the other for removal.
Make amendments as you proceed through the items and list of instructions.
Reading Order Advice: If there is columns with headings and text, I wouldnt expect the reading order to jump from one heading straight to another if there is text associated with that heading.

Return format: Give me the json data back only, with the amendments you make.

Mechanical notes (so your answer can be applied automatically):
- Each item has an `id` — keep every item and its `id` exactly as given; never invent, drop or duplicate ids. Re-arranging means changing the position of items (and their nesting) in the arrays.
- Never move text (or a type) from one item to another: each item's coordinates travel with its id, so to change reading order you must move the whole item object, and text amendments must be in-place corrections of that item's own text.
- To flag a duplicate item, keep it in the array and add `"remove": "duplicate"` to it — never just delete it (deleted items are restored automatically).
- ids are opaque labels, not sequence numbers: never renumber them. After a removal or re-arrangement, every remaining item keeps the exact id it came with, even if the ids no longer look sequential.
- Text may contain `[pN.M…]` placeholders marking where an inline formula belongs — treat them as part of the text and leave them exactly where they are.
- `box` is [left, top, right, bottom] as percentages of the page from the top-left corner; return it unchanged.
- Respond with raw JSON only: no code fences, no commentary, same shape as the input (`{"items": [...]}`).

User message (json data sent)

Page 4 json data:

{"items":[{"id":"p4.1","type":"heading","box":[12,8,33,10],"text":"1 Introduction"},{"id":"p4.2","type":"text","box":[11,12,89,34],"text":"Public investment is an important policy tool (Ramey, 2021), because it has two distinct properties. First, it has short-term demand-side effects similar to those of government consumption, and can therefore be used to stimulate the economy in the short run. Second, public investment increases long-lasting public capital that has long-term supply effects similar as the productivity increase. Both properties have been increasingly recognised by policymakers as useful instruments to manage the economy, especially after the Great Recession (see, e.g., Coenen et al. (2012) and Coenen et al. (2013)), but also in the more strategic longer run. A very prominent recent example is the report of Mario Draghi (Draghi, 2024), which among other things calls for a structural reform in Europe with a permanent increase in public investment. However, the effect of public investment on the economy depends not only on the level of investment, but also on the efficiency with which it is delivered. Typically, delays happen (Leeper et al., 2010), so benefits from investment accrue further in the future.","children":[{"id":"p4.2.1","type":"link","box":[52,12,58,14],"text":"(Ramey,"},{"id":"p4.2.2","type":"link","box":[59,12,64,14],"text":"2021),"},{"id":"p4.2.3","type":"link","box":[43,22,55,24],"text":"Coenen et al."},{"id":"p4.2.4","type":"link","box":[56,22,61,24],"text":"(2012)"},{"id":"p4.2.5","type":"link","box":[65,22,77,24],"text":"Coenen et al."},{"id":"p4.2.6","type":"link","box":[78,22,83,24],"text":"(2013)),"},{"id":"p4.2.7","type":"link","box":[25,26,31,27],"text":"(Draghi,"},{"id":"p4.2.8","type":"link","box":[32,26,37,27],"text":"2024),"},{"id":"p4.2.9","type":"link","box":[67,31,79,33],"text":"(Leeper et al.,"},{"id":"p4.2.10","type":"link","box":[80,31,85,33],"text":"2010),"}]},{"id":"p4.3","type":"text","box":[11,34,88,53],"text":"We investigate the effects of two frictions related to public investment that cause delays. The first friction, which we call time-to-plan, is the time that passes between the moment a public investment is announced and the time it starts being carried out. The second friction, called time-to-build, is the time that passes from the moment construction starts to when the project is delivered and put to use. There is an important distinction between them. Time-to-plan implies an announcement of public investment in the future, but no (or minimal) spending and hence no immediate stimulus until investment commences. Time-to-build implies that the stimulus from the demand-side related to public investment is already taking place, but the project has not yet been finished and put to use, so that there are no supply-side effects from higher public capital yet."},{"id":"p4.4","type":"text","box":[11,53,88,65],"text":"Delays can happen in either phase. During the planning phase the frictions causing delays are typically of a more bureaucratic nature: there are zoning issues, various permissions must be obtained, there may be objections from the public, litigations, etc. These can be sizeable. For instance, in Ireland the time between a permission is obtained and construction commences can come close to two years in some regions (NCPC, 2024). Frictions causing delays in time-to-build are typically more technical and related to the organisation of work, supply lines, availability of workers, etc.","children":[{"id":"p4.4.1","type":"link","box":[76,60,82,62],"text":"(NCPC,"},{"id":"p4.4.2","type":"link","box":[82,60,87,62],"text":"2024)."}]},{"id":"p4.5","type":"text","box":[11,65,88,79],"text":"Regardless of the reason, both types of delays are a common occurrence when public investment is concerned (Leeper et al., 2010), and at the same time important for the short-term economic fluctuations that are caused by government investment (Ramey, 2021). While these authors focused on the closed economy, we analyse these issues in an open economy that is a member of a monetary union. This has two implications. First, monetary policy reaction is (almost) absent, as the economy is small relative to the rest of the monetary union. Second, the effects of domestic prices on external competitiveness, i.e., on exports and imports, play an important role.","children":[{"id":"p4.5.1","type":"link","box":[35,67,46,69],"text":"(Leeper et al.,"},{"id":"p4.5.2","type":"link","box":[47,67,52,69],"text":"2010),"},{"id":"p4.5.3","type":"link","box":[81,69,88,70],"text":"(Ramey,"},{"id":"p4.5.4","type":"link","box":[12,70,17,72],"text":"2021)."}]},{"id":"p4.6","type":"text","box":[11,79,89,91],"text":"Delays in delivering public investment, however, are particularly interesting because of its productive property, in the sense that it increases the stock of public capital, which in turn increases productivity of the private sector. The notion has a long tradition starting at least from Baxter and King (1993) and continuing in Leeper et al. (2010) and Ramey (2021). This increase in productivity of the private sector occurs in the future (when public capital is constructed and put in productive use). Therefore, it has very similar properties to a positive news shock about an increase in future productivity,","children":[{"id":"p4.6.1","type":"link","box":[31,84,45,86],"text":"Baxter and King"},{"id":"p4.6.2","type":"link","box":[46,84,51,86],"text":"(1993)"},{"id":"p4.6.3","type":"link","box":[67,84,78,86],"text":"Leeper et al."},{"id":"p4.6.4","type":"link","box":[79,84,84,86],"text":"(2010)"},{"id":"p4.6.5","type":"link","box":[12,86,18,87],"text":"Ramey"},{"id":"p4.6.6","type":"link","box":[19,86,24,87],"text":"(2021)."}]},{"id":"p4.7","type":"footer","box":[49,94,51,95],"text":"3"}]}

Model response

{"items":[{"id":"p4.1","type":"heading","box":[12,8,33,10],"text":"1 Introduction"},{"id":"p4.2","type":"text","box":[11,12,89,34],"text":"Public investment is an important policy tool (Ramey, 2021), because it has two distinct properties. First, it has short-term demand-side effects similar to those of government consumption, and can therefore be used to stimulate the economy in the short run. Second, public investment increases long-lasting public capital that has long-term supply effects similar as the productivity increase. Both properties have been increasingly recognised by policymakers as useful instruments to manage the economy, especially after the Great Recession (see, e.g., Coenen et al. (2012) and Coenen et al. (2013)), but also in the more strategic longer run. A very prominent recent example is the report of Mario Draghi (Draghi, 2024), which among other things calls for a structural reform in Europe with a permanent increase in public investment. However, the effect of public investment on the economy depends not only on the level of investment, but also on the efficiency with which it is delivered. Typically, delays happen (Leeper et al., 2010), so benefits from investment accrue further in the future.","children":[{"id":"p4.2.1","type":"link","box":[52,12,58,14],"text":"(Ramey,"},{"id":"p4.2.2","type":"link","box":[59,12,64,14],"text":"2021),"},{"id":"p4.2.3","type":"link","box":[43,22,55,24],"text":"Coenen et al."},{"id":"p4.2.4","type":"link","box":[56,22,61,24],"text":"(2012)"},{"id":"p4.2.5","type":"link","box":[65,22,77,24],"text":"Coenen et al."},{"id":"p4.2.6","type":"link","box":[78,22,83,24],"text":"(2013)),"},{"id":"p4.2.7","type":"link","box":[25,26,31,27],"text":"(Draghi,"},{"id":"p4.2.8","type":"link","box":[32,26,37,27],"text":"2024),"},{"id":"p4.2.9","type":"link","box":[67,31,79,33],"text":"(Leeper et al.,"},{"id":"p4.2.10","type":"link","box":[80,31,85,33],"text":"2010),"}]},{"id":"p4.3","type":"text","box":[11,34,88,53],"text":"We investigate the effects of two frictions related to public investment that cause delays. The first friction, which we call time-to-plan, is the time that passes between the moment a public investment is announced and the time it starts being carried out. The second friction, called time-to-build, is the time that passes from the moment construction starts to when the project is delivered and put to use. There is an important distinction between them. Time-to-plan implies an announcement of public investment in the future, but no (or minimal) spending and hence no immediate stimulus until investment commences. Time-to-build implies that the stimulus from the demand-side related to public investment is already taking place, but the project has not yet been finished and put to use, so that there are no supply-side effects from higher public capital yet."},{"id":"p4.4","type":"text","box":[11,53,88,65],"text":"Delays can happen in either phase. During the planning phase the frictions causing delays are typically of a more bureaucratic nature: there are zoning issues, various permissions must be obtained, there may be objections from the public, litigations, etc. These can be sizeable. For instance, in Ireland the time between a permission is obtained and construction commences can come close to two years in some regions (NCPC, 2024). Frictions causing delays in time-to-build are typically more technical and related to the organisation of work, supply lines, availability of workers, etc.","children":[{"id":"p4.4.1","type":"link","box":[76,60,82,62],"text":"(NCPC,"},{"id":"p4.4.2","type":"link","box":[82,60,87,62],"text":"2024)."}]},{"id":"p4.5","type":"text","box":[11,65,88,79],"text":"Regardless of the reason, both types of delays are a common occurrence when public investment is concerned (Leeper et al., 2010), and at the same time important for the short-term economic fluctuations that are caused by government investment (Ramey, 2021). While these authors focused on the closed economy, we analyse these issues in an open economy that is a member of a monetary union. This has two implications. First, monetary policy reaction is (almost) absent, as the economy is small relative to the rest of the monetary union. Second, the effects of domestic prices on external competitiveness, i.e., on exports and imports, play an important role.","children":[{"id":"p4.5.1","type":"link","box":[35,67,46,69],"text":"(Leeper et al.,"},{"id":"p4.5.2","type":"link","box":[47,67,52,69],"text":"2010),"},{"id":"p4.5.3","type":"link","box":[81,69,88,70],"text":"(Ramey,"},{"id":"p4.5.4","type":"link","box":[12,70,17,72],"text":"2021)."}]},{"id":"p4.6","type":"text","box":[11,79,89,91],"text":"Delays in delivering public investment, however, are particularly interesting because of its productive property, in the sense that it increases the stock of public capital, which in turn increases productivity of the private sector. The notion has a long tradition starting at least from Baxter and King (1993) and continuing in Leeper et al. (2010) and Ramey (2021). This increase in productivity of the private sector occurs in the future (when public capital is constructed and put in productive use). Therefore, it has very similar properties to a positive news shock about an increase in future productivity,","children":[{"id":"p4.6.1","type":"link","box":[31,84,45,86],"text":"Baxter and King"},{"id":"p4.6.2","type":"link","box":[46,84,51,86],"text":"(1993)"},{"id":"p4.6.3","type":"link","box":[67,84,78,86],"text":"Leeper et al."},{"id":"p4.6.4","type":"link","box":[79,84,84,86],"text":"(2010)"},{"id":"p4.6.5","type":"link","box":[12,86,18,87],"text":"Ramey"},{"id":"p4.6.6","type":"link","box":[19,86,24,87],"text":"(2021)."}]},{"id":"p4.7","type":"footer","box":[49,94,51,95],"text":"3"}]}