{
    "document_id": 16887,
    "page": 8,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16998,
    "item_count": 10,
    "counts_by_type": {
        "list": 1,
        "list_item": 3,
        "text": 6
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p8.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 141.12,
                "t": 719.52,
                "r": 528.72,
                "b": 676.32
            },
            "text": "yellow mode on Wednesday, November 18. – Please note this tentative date can change due to weather or other unforeseen circumstances."
        },
        {
            "id": "p8.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 86.88,
                "t": 662.1102,
                "r": 529.2,
                "b": 568.56
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p8.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 87.6,
                        "t": 662.1102,
                        "r": 528.96,
                        "b": 630
                    },
                    "text": "The current work schedule is subject to change due to weather or other unforeseen circumstances."
                },
                {
                    "id": "p8.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 86.88,
                        "t": 615.7902,
                        "r": 529.2,
                        "b": 568.56
                    },
                    "text": "Motorists should use caution and be aware of construction vehicles entering and exiting the roadway throughout the duration of the project. The estimated completion date is spring."
                }
            ]
        },
        {
            "id": "p8.3",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 52.08,
                "t": 554.88,
                "r": 528.48,
                "b": 481.92
            },
            "text": "S.R. 45 (Tamiami Trail North) at Tobago Boulevard: Permit project: Motorists should expect nighttime/overnight right lane closures beginning Wednesday, November 4, 2026, from 8 p.m. through 6 a.m. Crews will be flying mast arms for signalization. Law enforcement will be present to manage traffic. Motorists should use caution when traveling through the work zone."
        },
        {
            "id": "p8.4",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 51.84,
                "t": 467.76,
                "r": 528.72,
                "b": 379.92
            },
            "text": "S.R. 45 (Tamiami Trail East) from Barefoot Williams Road to Lely Resort Boulevard: Permit project #2024-A-192-00008: Motorists can expect nighttime/overnight lane closures on State Road 45 northbound and southbound beginning Sunday, November 8 through Thursday, November 19, 2026. Crews will be conducting concrete work in the median and resurfacing the travel lanes at the Home Depot entrance. Motorists should use caution when traveling through the work zone."
        },
        {
            "id": "p8.5",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 366.96,
                "r": 528.72,
                "b": 278.4
            },
            "text": "S.R. 29 (East Main Street) from 11^{th} Street to 13^{th} Street: Permit project: Motorists should expect daytime lane closures on S.R. 29 southbound beginning Monday, October 19 through Friday, October 30 between 7 a.m. and 5 p.m. Crews will be performing work on poles on the south side of East Main Street. This will be in preparation for a future roundabout in the area. Motorists should use caution when traveling through the work zone."
        },
        {
            "id": "p8.6",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 264.96,
                "r": 528.96,
                "b": 177.12
            },
            "text": "S.R. 29 from South of I-75 to North of Bridge #030298: Construction project: This project delivers roadway improvements along S.R. 29 from south of I-75 to north of Bridge #030298 in Collier County. The work focuses on the milling and resurfacing of the roadway. Additionally, there will be upgrades to the pavement markings. Motorists can expect daytime and nighttime/overnight lane closures throughout the project."
        },
        {
            "id": "p8.7",
            "order": 9,
            "type": "list_item",
            "bbox": {
                "l": 87.36,
                "t": 164.59019999999998,
                "r": 528.24,
                "b": 119.52
            },
            "text": "Thursday night, October 29, the S.R. 29 northbound on-ramp towards I-75 southbound will be closed for paving operations. Motorists will need to utilize the detour."
        },
        {
            "id": "p8.8",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 122.88,
                "t": 119.76,
                "r": 528.96,
                "b": 77.76
            },
            "text": "Motorists traveling on S.R. 29 northbound (who want to access I-75 southbound) will need to continue until they reach the I-75 northbound on-ramp."
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}