{
    "document_id": 16887,
    "page": 4,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16998,
    "item_count": 13,
    "counts_by_type": {
        "form_field": 1,
        "link": 1,
        "list": 1,
        "list_item": 6,
        "text": 4
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p4.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 140.64,
                "t": 719.76,
                "r": 527.76,
                "b": 677.04
            },
            "text": "Ridge Road, motorists may exit at Golden Gate Parkway (Exit 105) westbound to northbound Livingston Road, then return to Pine Ridge Road. I-75 will remain open in both directions over Pine Ridge Road."
        },
        {
            "id": "p4.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 123.36,
                "t": 675.36,
                "r": 528.48,
                "b": 604.08
            },
            "text": "Motorists traveling east on Pine Ridge Road may enter southbound I-75, exit at Golden Gate Parkway, enter northbound I-75, and exit onto eastbound Pine Ridge Road. Motorists traveling west on Pine Ridge Road may enter northbound I-75, exit at Immokalee Road, enter southbound I-75, and exit onto westbound Pine Ridge Road."
        },
        {
            "id": "p4.3",
            "order": 3,
            "type": "list",
            "bbox": {
                "l": 87.36,
                "t": 602.88,
                "r": 528.48,
                "b": 345.6
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p4.3.1",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 124.08,
                        "t": 602.88,
                        "r": 528,
                        "b": 574.56
                    },
                    "text": "Please follow the posted detour signs or identify alternate routes and exercise caution through the detour area and anticipate delays.",
                    "marker": "○",
                    "children": [
                        {
                            "id": "p4.3.1.1",
                            "order": 5,
                            "type": "form_field",
                            "bbox": {
                                "l": 124.08,
                                "t": 602.88,
                                "r": 136.08,
                                "b": 590.88
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "radio",
                                "label": "Please follow the posted detour signs or identify alternate routes and exercise caution through the detour area and anticipate delays.",
                                "source": "glyph_estimate",
                                "bbox_estimated": true,
                                "label_source": "parent_text",
                                "label_ref": "p4.3.1",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                },
                {
                    "id": "p4.3.2",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 88.32,
                        "t": 560.7102,
                        "r": 527.04,
                        "b": 527.28
                    },
                    "text": "Crews will be working on permanent signalization, signal timing optimization, sign placement, wrong way vehicle detection systems, and sod placement."
                },
                {
                    "id": "p4.3.3",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 87.6,
                        "t": 514.3902,
                        "r": 528.48,
                        "b": 452.64
                    },
                    "text": "When necessary, motorists should anticipate lane closures on Pine Ridge Road during the nighttime/overnight hours of 7 p.m. to 7 a.m., and ramp closures from 8 p.m. to 6 a.m. Please use extra caution when driving through this area and expect delays."
                },
                {
                    "id": "p4.3.4",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 88.08,
                        "t": 439.1502,
                        "r": 528,
                        "b": 406.56
                    },
                    "text": "Crews will be working on clearing and grubbing and installing erosion control throughout the project area."
                },
                {
                    "id": "p4.3.5",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 87.36,
                        "t": 392.8302,
                        "r": 528.24,
                        "b": 345.6
                    },
                    "text": "Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is mid-2027. For more information please visit: https://www.swflroads.com/project/445296-1.",
                    "children": [
                        {
                            "id": "p4.3.5.1",
                            "order": 10,
                            "type": "link",
                            "bbox": {
                                "l": 234.474,
                                "t": 360.992,
                                "r": 473.748,
                                "b": 346.503
                            },
                            "text": "https://www.swflroads.com/project/445296-1.",
                            "attrs": {
                                "uri": "https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.swflroads.com%2Fproject%2F445296-1&data=05%7C02%7CBryn.Parsons%40dot.state.fl.us%7C22f0c5fdad474c7f4a4b08df3519a4d2%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C639288056387427380%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iOMVAA9%2Bl%2FHUth%2BpaWbrvVKtE8XwVntN%2FWqzQhUzr%2Bc%3D&reserved=0",
                                "action_type": "/URI"
                            }
                        }
                    ]
                }
            ]
        },
        {
            "id": "p4.4",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 51.84,
                "t": 332.4,
                "r": 528.96,
                "b": 186.48
            },
            "text": "I-75 at S.R. 951 (Exit 101) Interchange Improvements: FDOT is reconstructing the I-75 southbound on- and off-ramp connections and the northbound on-ramp connection to the mainline lanes at S.R. 951 (Exit 101). The northeast quadrant loop ramp will be connected to, and accessible only by, a direct flyover ramp from northbound Collier Boulevard starting south of the Davis Boulevard intersection. This single-lane flyover ramp will carry traffic over Beck Boulevard and a reconstructed I-75 southbound on-ramp. A single-lane flyover ramp extension will carry I-75 southbound traffic over Davis Boulevard to a new signalized intersection at Collier Boulevard and Business Circle North. This ramp will extend along the western side of Collier Boulevard."
        },
        {
            "id": "p4.5",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 107.28,
                "t": 172.56,
                "r": 528.96,
                "b": 143.04
            },
            "text": "The following activities are subject to change based on weather conditions and unforeseen underground conditions."
        },
        {
            "id": "p4.6",
            "order": 13,
            "type": "list_item",
            "bbox": {
                "l": 87.6,
                "t": 129.1902,
                "r": 528.48,
                "b": 81.84
            },
            "text": "Continuing during the nighttime/overnight hours from 8 p.m. through 6 a.m., excluding Friday and Saturday nights, motorists should expect the I-75 southbound on ramp from northbound S.R. 951 (Collier Boulevard) closed for",
            "marker": "-"
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}