{
    "document_id": 16887,
    "page": 34,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16998,
    "item_count": 8,
    "counts_by_type": {
        "link": 1,
        "text": 7
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p34.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 52.08,
                "t": 719.76,
                "r": 528.72,
                "b": 675.36
            },
            "text": "U.S. 17/92 at Powerline Road: Permits project: Expect southbound shoulder closures for widening and new turn lane work just south of Bargain Barn Road. Use caution and be prepared to merge from 9 a.m. to 4 p.m."
        },
        {
            "id": "p34.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 52.8,
                "t": 661.92,
                "r": 528.96,
                "b": 587.52
            },
            "text": "U.S. 17 from North of Transport Road to Avenue G S.W. in Bartow/Winter Haven: Construction project: This project includes milling and resurfacing, sidewalk work, curb and gutter, signal sensors and pavement markings. Expect nighttime/overnight lane closures Monday through Friday nights as crews continue paving and placing pavement markings. Use caution and be prepared to merge."
        },
        {
            "id": "p34.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 52.56,
                "t": 575.28,
                "r": 529.2,
                "b": 478.08
            },
            "text": "U.S. 17 from Snively Avenue/Lake Shipp Drive to North of SR 540 (Cypress Gardens Boulevard) in Winter Haven: Permit project: The permit project includes new driveways at the Target development and a traffic signal at the Chain of Lakes Complex/Target entrance. It also includes adding a second left-turn lane from southbound U.S. 17 to Snively Avenue, making it a double left turn. Expect nightly lane closures, Sunday through Thursday nights. Use caution and be prepared to merge."
        },
        {
            "id": "p34.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 464.88,
                "r": 528.72,
                "b": 395.28
            },
            "text": "U.S. 17 at S.R. 540 (Cameron Road) in Eagle Lake: Permit project: Polk County is constructing a new alignment of Thompson Nursery Road at the intersection of U.S. 17 and S.R. 540 (Cameron Road). It will be a four-lane collector road between U.S. 17 and Rifle Range Road. Crews will be working behind barrier wall with no additional lane closures scheduled."
        },
        {
            "id": "p34.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 52.08,
                "t": 381.84,
                "r": 528.96,
                "b": 294
            },
            "text": "S.R. 655/S.R. 620 (Recker Highway) from S.R. 540 to U.S. 92: Maintenance contracts: Crews will be performing safety striping and thermoplastic refresh work along Berkley Road, Recker Highway and Memorial Boulevard. Nighttime/overnight lane closures will occur on alternating nights from 8 p.m. to 6 a.m. through November 15, 2026. Flaggers will be present to direct traffic. Motorists should exercise caution in the area and be prepared to merge or stop when approaching active work zones."
        },
        {
            "id": "p34.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 52.56,
                "t": 281.04,
                "r": 528.96,
                "b": 134.88
            },
            "text": "S.R. 570 (Polk Parkway) Resurfacing and Roadside Resurfacing Project from West of Lakeland Highlands Road to South of U.S. 92 in Lakeland/Auburndale: Turnpike project: Polk Parkway/S.R. 570 is being resurfaced from west of Lakeland Highlands Road (milepost 8) to south of U.S. 92 (milepost 17) in Polk County. Work includes paving Polk Parkway, U.S. 98 ramps, Lakeland Highlands Road, and Winter Lake Road. This project also includes installing new guardrails, rumble strips, and highly reflective signs and pavement markings, and upgrading existing drainage. Construction will continue through mid-2026. Approximate cost: $20 million. For more information or questions about the project and/or traffic impacts contact Louis Grisoglio at Louis.grisoglio@dot.state.fl.us.",
            "children": [
                {
                    "id": "p34.6.1",
                    "order": 7,
                    "type": "link",
                    "bbox": {
                        "l": 227.32,
                        "t": 150.396,
                        "r": 392.086,
                        "b": 135.907
                    },
                    "text": "Louis.grisoglio@dot.state.fl.us.",
                    "attrs": {
                        "uri": "mailto:Louis.grisoglio@dot.state.fl.us",
                        "action_type": "/URI"
                    }
                }
            ]
        },
        {
            "id": "p34.7",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 52.56,
                "t": 121.68,
                "r": 528.48,
                "b": 76.8
            },
            "text": "S.R. 570B (Central Polk Parkway): Turnpike project: Florida's Turnpike Enterprise is constructing Central Polk Parkway/S.R. 570B, a new, four-lane (two lanes in each direction) toll roadway. This new stretch of roadway will begin at Polk Parkway/S.R."
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}