{
    "document_id": 16887,
    "page": 22,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16998,
    "item_count": 10,
    "counts_by_type": {
        "list": 1,
        "list_item": 5,
        "text": 4
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p22.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 704.88,
                "r": 529.2,
                "b": 603.36
            },
            "text": "I-275 from North of the Northbound Toll Plaza to the Hillsboro County Line: Materials project: Crews will close several lanes on south and northbound I-275 from north of the northbound toll plaza to the Hillsboro County line as the contractor performs core testing activities. The outside lane and shoulder will be temporarily closed on November 3, the inside lane and shoulder will be temporarily closed on November 4, and the outside lane and shoulder will be temporarily closed on November 5 from 9 p.m. to 5 a.m. Please use caution and watch for lane closures and traffic shifts."
        },
        {
            "id": "p22.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 589.2,
                "r": 528.96,
                "b": 502.32
            },
            "text": "I-75 (S.R. 93) at the Intersection of S.R. 64 and S.R. 70: Construction project: This project is for the construction of Arterial Dynamic Message Signs (ADMS) on I-75 at two interchanges in Manatee County. The items of work include the construction of ADMS, fiber optic cable, conduit, pull and splice boxes, verification closed circuit television (VCCTVs) cameras, power subsystem infrastructure, and device integration."
        },
        {
            "id": "p22.3",
            "order": 3,
            "type": "list_item",
            "bbox": {
                "l": 89.04,
                "t": 488.1,
                "r": 528.72,
                "b": 431.28
            },
            "text": "Motorists can expect a temporary right-hand closure on eastbound S.R. 70 prior to the I-75 interchange while crews perform utility work from 9 a.m. to 3 p.m. for the next several weeks. Schedule details will be posted as they become available.",
            "marker": "-"
        },
        {
            "id": "p22.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 89.04,
                "t": 417.12,
                "r": 527.76,
                "b": 388.08
            },
            "text": "Please use caution and watch for workers in or near the travel lanes. Expected completion is late-2026."
        },
        {
            "id": "p22.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 52.8,
                "t": 374.4,
                "r": 528.72,
                "b": 271.92
            },
            "text": "U.S. 301/S.R. 683 from U.S. 41 to South of 10th Street: Construction project: The Florida Department of Transportation (FDOT) will begin milling and resurfacing U.S. 301/S.R. 683 from U.S. 41 to south of 10th Street in Sarasota County. The improvements consist of milling and resurfacing, curb and gutter, sidewalk, signalization, lighting, and signing and pavement markings. Additionally, there will be a mid-block Pedestrian Hybrid Beacon (PHB) crossing constructed north of S. Payne Parkway."
        },
        {
            "id": "p22.6",
            "order": 6,
            "type": "list",
            "bbox": {
                "l": 82.08,
                "t": 258.29999999999995,
                "r": 528.24,
                "b": 89.04
            },
            "text": "",
            "attrs": {
                "item_count": 4
            },
            "children": [
                {
                    "id": "p22.6.1",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.32,
                        "t": 258.29999999999995,
                        "r": 528,
                        "b": 215.04
                    },
                    "text": "Initial work will consist of daytime concrete removal and replacement, soft digs, project preparation activities and other associated operations. No lane closures for the above activities are anticipated.",
                    "marker": "-"
                },
                {
                    "id": "p22.6.2",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.08,
                        "t": 202.26,
                        "r": 528.24,
                        "b": 172.32
                    },
                    "text": "Motorists can expect to encounter overnight lane closures starting in late October from 8 p.m. to 6 a.m. as milling and resurfacing operations begin."
                },
                {
                    "id": "p22.6.3",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.32,
                        "t": 160.01999999999998,
                        "r": 527.52,
                        "b": 130.32
                    },
                    "text": "Motorists can expect workers and construction equipment to be present during the day/night."
                },
                {
                    "id": "p22.6.4",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.32,
                        "t": 117.89999999999998,
                        "r": 527.76,
                        "b": 89.04
                    },
                    "text": "Motorists may experience uneven lanes within the project limits during construction."
                }
            ]
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}