            "id": "p101.1",
            "order": 1,
            "type": "heading",
            "bbox": {
                "l": 1.68,
                "t": 538.8,
                "r": 706.56,
                "b": 439.44
            },
            "text": "WATER Pollution\nOrdinance Language\nData Center Accountability for the Citizens of Dubuque\nCounty",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p101.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 51.6,
                "t": 393.85,
                "r": 656.16,
                "b": 109.68
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p101.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 51.6,
                        "t": 393.85,
                        "r": 656.16,
                        "b": 217.92
                    },
                    "text": "D. Consumption Ceiling. The permit shall state maximum annual and peak-day water consumption, which shall not exceed [5,000] gallons per day cumulative for all operations, including server cooling, building climate control, and site maintenance, unless the Board makes written findings supporting a different ceiling. Exceedance of any ceiling is a violation. Water for server and computing rack cooling is restricted under subsection (B); this ceiling governs all other water use and total cumulative facility consumption in any event.",
                    "marker": "-"
                },
                {
                    "id": "p101.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 54.72,
                        "t": 199.45,
                        "r": 649.44,
                        "b": 109.68
                    },
                    "text": "Verification. Before operations commence, a licensed professional engineer shall verify by pressure testing or equivalent inspection that all Closed-Loop systems are leak-tight. Cooling system integrity shall be re-verified upon any Material Change to the cooling plant.",
                    "marker": "E."
                }
            ]
        },
        {
            "id": "p101.3",
            "order": 5,
            "type": "footer",
            "bbox": {
                "l": 624.72,
                "t": 21.84,
                "r": 701.76,
                "b": 8.64
            },
            "text": "Page 101 of 113",