{
    "document_id": 16843,
    "page": 71,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16958,
    "item_count": 6,
    "counts_by_type": {
        "footer": 1,
        "link": 2,
        "text": 3
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p71.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 715.92,
                "r": 542.4,
                "b": 667.44
            },
            "text": "Build Alternative, across a consistent set of engineering, environmental, and social criteria. The alternatives evaluation matrix for the No-Build Alternative and the Build Alternative is provided in Table 5-3.",
            "children": [
                {
                    "id": "p71.1.1",
                    "order": 2,
                    "type": "link",
                    "bbox": {
                        "l": 69.75,
                        "t": 684.023,
                        "r": 122.649,
                        "b": 659.198
                    },
                    "text": "Table 5-3.",
                    "attrs": {
                        "target_page": 72,
                        "action_type": "/GoTo"
                    }
                }
            ]
        },
        {
            "id": "p71.2",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 657.12,
                "r": 543.36,
                "b": 575.04
            },
            "text": "The matrix provides a clear, objective framework for evaluating the advantages and disadvantages of each alternative, supporting data-driven decision-making and ensuring compliance with the NEPA. The matrix helps decision-makers select an alternative that optimally balances transportation needs, community priorities, environmental considerations, and long-term sustainability."
        },
        {
            "id": "p71.3",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 68.88,
                "t": 565.68,
                "r": 543.12,
                "b": 466.08
            },
            "text": "The matrix includes potential environmental impacts and estimated costs. The construction costs were prepared using the FDOT Long Range Estimate system on March 31, 2026, located in Appendix E. Right-of-way costs were estimated in April of 2026. Design and Construction Engineering and Inspection costs were calculated to be 10% of the construction cost. Table 5-3 shows that the No-Build Alternative does not meet the project purpose and need but is included as a baseline for comparison.",
            "children": [
                {
                    "id": "p71.3.1",
                    "order": 5,
                    "type": "link",
                    "bbox": {
                        "l": 488.929,
                        "t": 516.594,
                        "r": 542.25,
                        "b": 499.769
                    },
                    "text": "Table 5-3",
                    "attrs": {
                        "target_page": 72,
                        "action_type": "/GoTo"
                    }
                }
            ]
        },
        {
            "id": "p71.4",
            "order": 6,
            "type": "footer",
            "bbox": {
                "l": 494.4,
                "t": 74.64,
                "r": 540,
                "b": 60
            },
            "text": "Page | 61",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}