{
    "document_id": 16843,
    "page": 11,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16958,
    "item_count": 8,
    "counts_by_type": {
        "footer": 1,
        "heading": 2,
        "text": 5
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p11.1",
            "order": 1,
            "type": "heading",
            "bbox": {
                "l": 204.96,
                "t": 719.28,
                "r": 407.04,
                "b": 701.76
            },
            "text": "1.0 PROJECT SUMMARY",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p11.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 69.6,
                "t": 686.4,
                "r": 212.88,
                "b": 671.76
            },
            "text": "1.1 Project Description",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p11.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 657.12,
                "r": 542.88,
                "b": 491.04
            },
            "text": "The Florida Department of Transportation (FDOT), Di[p11.3.1]rict One (D1) is conducting a Project Development and Environment (PD&E) study, known as [p11.3.2]e Bradenton-Palmetto Connector (BPC), to evaluate capacity and mobility improvements to United States (US) 41/State Road (SR) 55/1 st Street (St)/Tamiami Trail (Trl) and US 301/SR 683 including roadway widening, bridge reconstruction, new stormwater management facilities (SMF), new floodplain compensation (FPC) sites, and bicycle and pedestrian accommodations. The study limits begin at US 301/SR 683 from 9[p11.3.3] St East, north of the City of Bradenton, Florida, and continues along US 41 to north of 25 th St East, north of the City of Palmetto, Florida. The project also crosses the Manatee River. The study limits extend approximately 4.5 miles, all within Manatee County. The project location and study limits are shown in Figure 1-1.",
            "children": [
                {
                    "id": "p11.3.1",
                    "order": 4,
                    "type": "text",
                    "bbox": {
                        "l": 68.64,
                        "t": 657.12,
                        "r": 542.88,
                        "b": 491.04
                    },
                    "text": "^{st}",
                    "attrs": {
                        "inline": true,
                        "text_offset": 51,
                        "text_span": 9,
                        "bbox_estimated": true
                    }
                },
                {
                    "id": "p11.3.2",
                    "order": 5,
                    "type": "text",
                    "bbox": {
                        "l": 68.64,
                        "t": 657.12,
                        "r": 542.88,
                        "b": 491.04
                    },
                    "text": "^{th}",
                    "attrs": {
                        "inline": true,
                        "text_offset": 149,
                        "text_span": 9,
                        "bbox_estimated": true
                    }
                },
                {
                    "id": "p11.3.3",
                    "order": 6,
                    "type": "text",
                    "bbox": {
                        "l": 68.64,
                        "t": 657.12,
                        "r": 542.88,
                        "b": 491.04
                    },
                    "text": "^{th}",
                    "attrs": {
                        "inline": true,
                        "text_offset": 567,
                        "text_span": 9,
                        "bbox_estimated": true
                    }
                }
            ]
        },
        {
            "id": "p11.4",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 68.88,
                "t": 480.96,
                "r": 543.12,
                "b": 347.76
            },
            "text": "In 2025, FDOT D1 completed a PD&E study for the Hernando DeSoto Bridge (structure #130053) Replacement from westbound SR 64 to Haben Boulevard (Blvd) in Manatee County, Florida (FPID 442630-1-22-01, ETDM 14510). That study evaluated replacing the existing four-lane DeSoto Bridge with a new four-lane bridge that included wider shoulders, upgraded pedestrian facilities and other safety features. The DeSoto Bridge Replacement PD&E study limits fall within the BPC PD&E study limits; however, it did not include adding lanes for capacity improvements. This BPC PD&E study does include adding additional lanes both on the roadway and the DeSoto Bridge to accommodate capacity needed within the project study area."
        },
        {
            "id": "p11.5",
            "order": 8,
            "type": "footer",
            "bbox": {
                "l": 500.64,
                "t": 74.4,
                "r": 540.24,
                "b": 59.76
            },
            "text": "Page | 1",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}