{
    "document_id": 16777,
    "page": 2,
    "width_pt": 630,
    "height_pt": 810,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16887,
    "item_count": 22,
    "counts_by_type": {
        "caption": 1,
        "figure": 4,
        "footer": 2,
        "footnote": 2,
        "heading": 4,
        "link": 1,
        "text": 6,
        "title": 2
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p2.1",
            "order": 1,
            "type": "figure",
            "bbox": {
                "l": 40.8,
                "t": 784.08,
                "r": 332.64,
                "b": 596.64
            },
            "text": "",
            "attrs": {
                "block_label": "image",
                "embedded_text": "EASEMENT\nVARIES 0'-48' 4' 12' 4.5'\nBUFFER SHARED USE PATH BUFFER\n20.5' LIVINGSTON ROAD\n(SOUTHBOUND)\nEXISTING RIGHT OF WAY VARIES TO REMAIN\nPROPOSED 0' - 115'\nRIGHT OF WAY\nVARIES 0'-29'\nALTERNATIVE 1 (LIVINGSTON ROAD)"
            }
        },
        {
            "id": "p2.2",
            "order": 2,
            "type": "figure",
            "bbox": {
                "l": 41.04,
                "t": 588.24,
                "r": 332.64,
                "b": 403.68
            },
            "text": "",
            "attrs": {
                "block_label": "image",
                "embedded_text": "4' BUFFER 4' BUFFER\nWIDTH VARIES WIDTH VARIES\n12'\nFPL UTILITY EASEMENT SHARED\nVARIES 110' TO 405' USE PATH\nALTERNATIVE 2 (FPL EASEMENT)"
            }
        },
        {
            "id": "p2.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 346.08,
                "t": 767.76,
                "r": 511.2,
                "b": 754.56
            },
            "text": "Alternative 1 - Livingston Road",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 344.88,
                "t": 753.84,
                "r": 597.6,
                "b": 623.04
            },
            "text": "Alternative 1 proposes constructing a new 12-ft wide shared use path with a 4.5-foot separation from the roadway, from the back of curb, and a 4-ft buffer area behind the path. The alignment for Build Alternative 1 is parallel to the west side of Livingston Road for the entire 11.5 miles of study corridor. Right of way needs for Alternative 1 vary along the corridor due to existing right-of-way widths and/or existing easement widths."
        },
        {
            "id": "p2.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 345.6,
                "t": 573.6,
                "r": 503.04,
                "b": 560.4
            },
            "text": "Alternative 2 - FPL Easement",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 344.88,
                "t": 559.2,
                "r": 597.36,
                "b": 428.88
            },
            "text": "Alternative 2 proposes a 12-ft wide shared use path with minimum 4 ft buffers on both sides within the FPL utility easement along the 11.5 miles of the study corridor. The alignment for Build Alternative 2 follows the existing gravel maintenance road within the FPL utility easement. Right of way needs for this alternative vary along the corridor and will be refined in the design phase."
        },
        {
            "id": "p2.7",
            "order": 7,
            "type": "figure",
            "bbox": {
                "l": 50.16,
                "t": 377.04,
                "r": 175.92,
                "b": 305.76
            },
            "text": "",
            "attrs": {
                "block_label": "image"
            }
        },
        {
            "id": "p2.8",
            "order": 8,
            "type": "title",
            "bbox": {
                "l": 199.68,
                "t": 379.2,
                "r": 481.92,
                "b": 359.52
            },
            "text": "LIVINGSTON FPL TRAIL EXTENSION",
            "attrs": {
                "block_label": "doc_title"
            },
            "level": 2
        },
        {
            "id": "p2.9",
            "order": 9,
            "type": "title",
            "bbox": {
                "l": 199.68,
                "t": 350.4,
                "r": 533.76,
                "b": 330
            },
            "text": "From Radio Road to the Collier County Line",
            "attrs": {
                "block_label": "doc_title"
            },
            "level": 2
        },
        {
            "id": "p2.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 199.68,
                "t": 324.24,
                "r": 496.08,
                "b": 304.32
            },
            "text": "Project Development & Environment Study\nNovember 2025"
        },
        {
            "id": "p2.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 520.32,
                "t": 316.56,
                "r": 607.68,
                "b": 301.44
            },
            "text": "November 2025"
        },
        {
            "id": "p2.12",
            "order": 12,
            "type": "heading",
            "bbox": {
                "l": 29.04,
                "t": 283.2,
                "r": 104.16,
                "b": 268.56
            },
            "text": "CONTACT US!",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.13",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 28.32,
                "t": 267.36,
                "r": 259.44,
                "b": 213.84
            },
            "text": "FDOT encourages the public to participate in the Livingston FPL Trail Extension PD&E Study public meeting. If you have questions regarding the meeting, please contact the FDOT Project Manager:"
        },
        {
            "id": "p2.14",
            "order": 14,
            "type": "heading",
            "bbox": {
                "l": 29.28,
                "t": 188.16,
                "r": 132.48,
                "b": 173.28
            },
            "text": "PROJECT CONTACT",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.15",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 28.32,
                "t": 173.04,
                "r": 256.08,
                "b": 96.96
            },
            "text": "Adam Rose | Project Manager\nFlorida Department of Transportation - District One\nEnvironmental Management Office\n801 North Broadway Avenue | Bartow, FL 33809\nTel: (863) 519-2832\nEmail: Adam.Rose@dot.state.fl.us"
        },
        {
            "id": "p2.16",
            "order": 16,
            "type": "caption",
            "bbox": {
                "l": 309.12,
                "t": 287.28,
                "r": 564,
                "b": 271.2
            },
            "text": "FPID 447514-1: PD&E Study Schedule",
            "attrs": {
                "block_label": "figure_title"
            }
        },
        {
            "id": "p2.17",
            "order": 17,
            "type": "figure",
            "bbox": {
                "l": 272.4,
                "t": 262.08,
                "r": 603.6,
                "b": 100.8
            },
            "text": "",
            "attrs": {
                "block_label": "image",
                "embedded_text": "Q4 2024 Q1 2025 Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026 Q4 2026 Q1 2027\nSTUDY BEGINS\nEXISTING CONDITIONS\nKICKOFF\nNEWSLETTER Summer 2025\nSummer 2025\nPUBLIC\nALTERNATIVES\nWORKSHOP Late Late 2025 2025\nREFINE PROJECT\nALTERNATIVES\nPUBLIC HEARING\nSummer/Fall Summer/Fall 2026 2026\nLOCATION & DESIGN\nCONCEPT\nACCEPTANCE Spring Spring 2027 2027\nPublic Public Workshop/Public Workshop/Public Hearing Hearing Newsletter Newsletter Study Study Approved Approved"
            }
        },
        {
            "id": "p2.18",
            "order": 18,
            "type": "footnote",
            "bbox": {
                "l": 99.36,
                "t": 611.52,
                "r": 265.2,
                "b": 600
            },
            "text": "ALTERNATIVE 1 (LIVINGSTON ROAD)",
            "attrs": {
                "block_label": "vision_footnote"
            }
        },
        {
            "id": "p2.19",
            "order": 19,
            "type": "footnote",
            "bbox": {
                "l": 271.68,
                "t": 92.4,
                "r": 439.44,
                "b": 79.44
            },
            "text": "Preliminary - subject to change",
            "attrs": {
                "block_label": "vision_footnote"
            }
        },
        {
            "id": "p2.20",
            "order": 20,
            "type": "footer",
            "bbox": {
                "l": 28.32,
                "t": 75.84,
                "r": 597.12,
                "b": 55.44
            },
            "text": "The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by FDOT pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated May 26, 2022 and executed by the Federal Highway Administration and FDOT.",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p2.21",
            "order": 21,
            "type": "footer",
            "bbox": {
                "l": 56.64,
                "t": 47.04,
                "r": 572.88,
                "b": 32.16
            },
            "text": "Connect on the web by visiting www.SWFLROADS.com project/447514-1 for more project details.",
            "attrs": {
                "block_label": "footer"
            },
            "children": [
                {
                    "id": "p2.21.1",
                    "order": 22,
                    "type": "link",
                    "bbox": {
                        "l": 8.0685,
                        "t": 48.5211,
                        "r": 622.2189,
                        "b": 28.7532
                    },
                    "text": "Connect on the web by visiting www.SWFLROADS.com project/447514-1 for more project details.",
                    "attrs": {
                        "uri": "https://www.swflroads.com/project/447514-1",
                        "action_type": "/URI"
                    }
                }
            ]
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}