{
    "document_id": 16282,
    "page": 2,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 16394,
    "item_count": 13,
    "counts_by_type": {
        "footer": 1,
        "heading": 5,
        "text": 7
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p2.1",
            "order": 1,
            "type": "heading",
            "bbox": {
                "l": 69.84,
                "t": 705.12,
                "r": 122.4,
                "b": 692.4
            },
            "text": "Section 1",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 69.84,
                "t": 690.96,
                "r": 118.8,
                "b": 679.2
            },
            "text": "Purpose",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 678.72,
                "r": 541.68,
                "b": 618.48
            },
            "text": "Kentucky State University is seeking bids from qualified and experienced painting contractors to provide professional painting services for the exterior surfaces of the Julian M. Carroll, Academic Services Building located at 400 East Main Street, Frankfort KY on the main University campus."
        },
        {
            "id": "p2.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 69.36,
                "t": 611.52,
                "r": 539.28,
                "b": 595.68
            },
            "text": "The project scope includes wall repair, paint preparation, paint application, and cleanup."
        },
        {
            "id": "p2.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 69.12,
                "t": 588,
                "r": 527.52,
                "b": 543.12
            },
            "text": "The information and instructions set forth below are designed to solicit responses that will demonstrate your company's capability to satisfy the University's requirements. Each company is requested to submit its most competitive offer."
        },
        {
            "id": "p2.6",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 69.6,
                "t": 524.16,
                "r": 169.68,
                "b": 497.04
            },
            "text": "Section 2\nBid Specifications",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.7",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 69.6,
                "t": 486.72,
                "r": 200.16,
                "b": 472.32
            },
            "text": "SCOPE OF SERVICES",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 68.4,
                "t": 463.2,
                "r": 540.24,
                "b": 342.24
            },
            "text": "The Service Provider (hereinafter called the “Contractor”) shall recognize and perform in accordance with all stated intents, specifications and stipulations contained or referenced. Each bidder shall be responsible for researching the existing conditions and matters that affect the cost or performance of the services. The Contractor shall furnish all labor, equipment, tools, services, skills, etc., required to perform duties outlined in the ensuing contract. The building and campus are open for inspection from 8:00am-4:00pm Monday-Friday to familiarize oneself with measurements and conditions of the subject property. Contact the buyer for additional information if needed."
        },
        {
            "id": "p2.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 335.52,
                "r": 541.92,
                "b": 276.24
            },
            "text": "The intent is to maintain a professional appearance of the property as determined by the University, and the Contractor shall maintain such appearance. Any discrepancies in the understanding of this clause shall be resolved in a manner as determined by the University."
        },
        {
            "id": "p2.10",
            "order": 10,
            "type": "heading",
            "bbox": {
                "l": 87.36,
                "t": 268.32,
                "r": 220.08,
                "b": 253.44
            },
            "text": "A. Project Description",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 99.6,
                "t": 245.28,
                "r": 541.44,
                "b": 169.92
            },
            "text": "For the Contractor to properly perform and complete their work, the University will cooperate by providing access to the work areas and any staging, offloading or preparation areas that are required. The Contractor shall be familiar with the University Campus and understand how the existing conditions will affect the work during maintenance services."
        },
        {
            "id": "p2.12",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 99.6,
                "t": 162.48,
                "r": 535.2,
                "b": 57.84
            },
            "text": "The Contractor shall visit and examine the site to become acquainted with the adjacent areas, means of approach to the site and conditions of actual job site. Failure to visit the site or failure to examine all Contract Documents will in no way relieve the Contractor from necessity of furnishing any materials or equipment or performing any work that may be required to complete the work in accordance with the RFB. Neglect of above requirements will not be accepted as reason for delay in the work or additional compensation."
        },
        {
            "id": "p2.13",
            "order": 13,
            "type": "footer",
            "bbox": {
                "l": 483.6,
                "t": 25.44,
                "r": 541.44,
                "b": 12.96
            },
            "text": "Page 2 of 15",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}