{
    "document_id": 15260,
    "page": 249,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 15375,
    "item_count": 20,
    "counts_by_type": {
        "footer": 2,
        "form_field": 3,
        "heading": 2,
        "list": 1,
        "list_item": 3,
        "text": 9
    },
    "build_ms": 3,
    "items": [
        {
            "id": "p249.1",
            "order": 1,
            "type": "heading",
            "bbox": {
                "l": 236.16,
                "t": 713.52,
                "r": 371.04,
                "b": 655.44
            },
            "text": "2018-2024 CAPITAL PLAN\nPROPOSED CAPITAL PROJECT.\nFORM SYP-P2\nPLAN VERSION - 1\n4/17/2017",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p249.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 72,
                "t": 645.84,
                "r": 498.48,
                "b": 573.84
            },
            "text": "complete review of the KSU central boiler plant and steam distribution system with evaluation of impact from EPA regulations. They recommended replacement of the steam heating system with a distributed hot water distribution system and multiple hot water boiler rooms. Following is taken from the Engineers Executive Summary - Programming Document date June 4, 2015."
        },
        {
            "id": "p249.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 72,
                "t": 561.84,
                "r": 318,
                "b": 550.56
            },
            "text": "Project Description from Original DECA RFQ:"
        },
        {
            "id": "p249.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 71.52,
                "t": 549.6,
                "r": 496.32,
                "b": 500.64
            },
            "text": "The least expensive option discussed during the State Budget review was selected for funding. A $10,400,000 project ($8,700,000 construction) will allow replacement of the two (2) old coal boilers with one (1) new natural gas boiler and replacement of some steam distribution lines."
        },
        {
            "id": "p249.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 71.76,
                "t": 501.36,
                "r": 471.12,
                "b": 478.08
            },
            "text": "This project will replace boilers and repair a portion of the existing steam plant system."
        },
        {
            "id": "p249.6",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 72.48,
                "t": 465.36,
                "r": 166.08,
                "b": 454.8
            },
            "text": "Recommendations:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p249.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 71.76,
                "t": 453.84,
                "r": 490.32,
                "b": 394.56
            },
            "text": "Three major options are being compared for the University's consideration. Each option will consider (1) first and future cost, (2) life cycle cost (total cost of ownership), (3) energy/efficiency, (4) maintenance considerations, (5) system complexity, and (6) regulatory considerations/fuel source."
        },
        {
            "id": "p249.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 72.24,
                "t": 393.6,
                "r": 486.72,
                "b": 345.36
            },
            "text": "The recommended option for implementation is Option 3 based on total cost of ownership and risk for the University. This option will require an additional funding request of ~$7,000,000 for construction to fully implement the transition from steam to hot water heating."
        },
        {
            "id": "p249.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 72.24,
                "t": 333.12,
                "r": 498.72,
                "b": 248.16
            },
            "text": "Option 3 offers the best life cycle long-term option for the University. This option is predicated on securing additional capital funding through an additional budgetary request for another construction phase to complete the total project scope and this offers certain risk. This option will eliminate the use of coal and the future risk associated with coal and regulatory compliance. Note that the only higher educational institutions, in Kentucky, that still operate with coal plants"
        },
        {
            "id": "p249.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 71.76,
                "t": 249.36,
                "r": 474.48,
                "b": 227.04
            },
            "text": "are UK and EKU. All other Universities have transitioned away from coal heating plants."
        },
        {
            "id": "p249.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 71.76,
                "t": 224.88,
                "r": 497.76,
                "b": 141.12
            },
            "text": "Option 3 Description: Replace all boilers and install (6) natural gas high efficiency hot water boilers with a total plant capacity of ~36,000,000 btu/h. Project would phase-out all of the steam infrastructure; however, the current construction funds will allow for installation of 3 or 4 of the new boilers and associated piping infrastructure. Future boilers and piping would have to be installed in a future construction phase and funding would need to be requested and secured to fully implement this option."
        },
        {
            "id": "p249.12",
            "order": 12,
            "type": "list",
            "bbox": {
                "l": 71.52,
                "t": 129.84,
                "r": 486.96,
                "b": 82.08
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p249.12.1",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 129.84,
                        "r": 111.6,
                        "b": 119.28
                    },
                    "text": "PROS",
                    "marker": "□",
                    "children": [
                        {
                            "id": "p249.12.1.1",
                            "order": 14,
                            "type": "form_field",
                            "bbox": {
                                "l": 71.76,
                                "t": 129.84,
                                "r": 82.32,
                                "b": 119.28
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "checkbox",
                                "label": "PROS",
                                "source": "glyph_estimate",
                                "bbox_estimated": true,
                                "label_source": "parent_text",
                                "label_ref": "p249.12.1",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                },
                {
                    "id": "p249.12.2",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 117.6,
                        "r": 351.12,
                        "b": 106.32
                    },
                    "text": "First Cost - Partial implementation in Phase I.",
                    "marker": "□",
                    "children": [
                        {
                            "id": "p249.12.2.1",
                            "order": 16,
                            "type": "form_field",
                            "bbox": {
                                "l": 71.52,
                                "t": 117.6,
                                "r": 82.8,
                                "b": 106.32
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "checkbox",
                                "label": "First Cost - Partial implementation in Phase I.",
                                "source": "glyph_estimate",
                                "bbox_estimated": true,
                                "label_source": "parent_text",
                                "label_ref": "p249.12.2",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                },
                {
                    "id": "p249.12.3",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 72,
                        "t": 106.56,
                        "r": 486.96,
                        "b": 82.08
                    },
                    "text": "Life Cycle Cost - Hot water heating system offers the lowest life cycle cost of the options being considered.",
                    "marker": "□",
                    "children": [
                        {
                            "id": "p249.12.3.1",
                            "order": 18,
                            "type": "form_field",
                            "bbox": {
                                "l": 72,
                                "t": 106.56,
                                "r": 84,
                                "b": 94.56
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "checkbox",
                                "label": "Life Cycle Cost - Hot water heating system offers the lowest life cycle cost of the options being considered.",
                                "source": "glyph_estimate",
                                "bbox_estimated": true,
                                "label_source": "parent_text",
                                "label_ref": "p249.12.3",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                }
            ]
        },
        {
            "id": "p249.13",
            "order": 19,
            "type": "footer",
            "bbox": {
                "l": 269.04,
                "t": 41.28,
                "r": 333.84,
                "b": 31.2
            },
            "text": "Page 3 of 5",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p249.14",
            "order": 20,
            "type": "footer",
            "bbox": {
                "l": 189.6,
                "t": 29.52,
                "r": 456.72,
                "b": 18.72
            },
            "text": "Repair Boilers & Aging Distribution Lines Ph II",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}