{
    "document_id": 15117,
    "page": 154,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 15245,
    "item_count": 28,
    "counts_by_type": {
        "figure": 1,
        "form_field": 5,
        "heading": 1,
        "list": 3,
        "list_item": 7,
        "text": 11
    },
    "build_ms": 4,
    "items": [
        {
            "id": "p154.1",
            "order": 1,
            "type": "list_item",
            "bbox": {
                "l": 186.48,
                "t": 716.88,
                "r": 556.56,
                "b": 678
            },
            "text": "Contractor will provide a project coordinator who will act as the liaison between University personnel and the MLS instructional design team as well as provide reporting on the transition process to key stakeholders.",
            "marker": "-"
        },
        {
            "id": "p154.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 185.28,
                "t": 677.28,
                "r": 554.64,
                "b": 573.36
            },
            "text": "- Contractor will provide an instructional design team to manually move existing courses from the legacy LMS into the approved template.\nContractor will conduct a basic analysis of each transitioned course as it reorganizes content for adaptation to the approved course template. No material changes will be made to content without consultation of University-approved SMEs. Within reason, Contractor will assist in making minor changes to materials in order to improve fit within the newly approved course template."
        },
        {
            "id": "p154.3",
            "order": 3,
            "type": "list",
            "bbox": {
                "l": 185.52,
                "t": 572.88,
                "r": 556.32,
                "b": 467.28
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p154.3.1",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 186.24,
                        "t": 572.88,
                        "r": 556.08,
                        "b": 520.8
                    },
                    "text": "Contractor will check all transitioned courses for ADA compliance. Contractor will make minor edits to existing content in order to achieve ADA compliance; however, Contractor will not perform extensive edits but will report those non-compliant materials to University.",
                    "marker": "-"
                },
                {
                    "id": "p154.3.2",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 185.52,
                        "t": 520.08,
                        "r": 556.32,
                        "b": 467.28
                    },
                    "text": "Contractor will provide basic reporting to University on courses found to have missing or insufficient materials based on the newly approved course template. Contractor is not redesigning these courses and will not be responsible for correcting such items which are reported.",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p154.4",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 114.24,
                "t": 455.04,
                "r": 545.52,
                "b": 441.36
            },
            "text": "o Redevelop courses to conform to the new template and best practices (Months 5-12)"
        },
        {
            "id": "p154.5",
            "order": 7,
            "type": "list",
            "bbox": {
                "l": 148.8,
                "t": 441.431,
                "r": 556.08,
                "b": 377.04
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p154.5.1",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 150.48,
                        "t": 441.431,
                        "r": 282.72,
                        "b": 429.254
                    },
                    "text": "Redevelop 24 courses"
                },
                {
                    "id": "p154.5.2",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 148.8,
                        "t": 429.12,
                        "r": 556.08,
                        "b": 377.04
                    },
                    "text": "Contractor will work with designated SMEs from University to redesign selected courses. Once courses are designed, MLS personnel will construct these courses within University's instance of the LMS, and within the newly designed courses template.",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p154.6",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 132.48,
                "t": 376.08,
                "r": 511.92,
                "b": 362.88
            },
            "text": "As part of this project, Contractor agrees to provide the following services:"
        },
        {
            "id": "p154.7",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 162.24,
                "t": 362.88,
                "r": 554.4,
                "b": 312.48
            },
            "text": "Contractor will provide all software and resources used to develop courses but will not be responsible for the cost of courseware or materials which are implemented by University-approved SMEs within courses as part of the curriculum.",
            "children": [
                {
                    "id": "p154.7.1",
                    "order": 12,
                    "type": "form_field",
                    "bbox": {
                        "l": 171.33,
                        "t": 362.15,
                        "r": 175.692209,
                        "b": 351
                    },
                    "text": "",
                    "attrs": {
                        "field_kind": "checkbox",
                        "label": "Contractor will provide all software and resources used to develop courses but will not be responsible for the cost of courseware or materials which are implemented by University-approved SMEs within courses as part of the curriculum.",
                        "checked": true,
                        "source": "glyph",
                        "label_source": "parent_text",
                        "label_ref": "p154.7",
                        "text_offset": 0,
                        "text_span": 0
                    }
                }
            ]
        },
        {
            "id": "p154.8",
            "order": 13,
            "type": "list",
            "bbox": {
                "l": 189.33,
                "t": 360.998,
                "r": 552.679,
                "b": 350.823
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p154.8.1",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 189.33,
                        "t": 360.998,
                        "r": 552.679,
                        "b": 350.823
                    },
                    "text": "Contractor will provide all design and development personnel, except for the SMEs, who will be provided and compensated by KSU.",
                    "marker": "■",
                    "children": [
                        {
                            "id": "p154.8.1.1",
                            "order": 15,
                            "type": "form_field",
                            "bbox": {
                                "l": 171.33,
                                "t": 311.15,
                                "r": 175.692209,
                                "b": 300
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "checkbox",
                                "label": "Contractor will provide all design and development personnel, except for the SMEs, who will be provided and compensated by KSU.",
                                "checked": true,
                                "source": "glyph",
                                "label_source": "parent_text",
                                "label_ref": "p154.8.1",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                },
                {
                    "id": "p154.8.2",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 189.33,
                        "t": 360.998,
                        "r": 552.679,
                        "b": 350.823
                    },
                    "text": "Contractor will provide the following design and development personnel:",
                    "marker": "■",
                    "children": [
                        {
                            "id": "p154.8.2.1",
                            "order": 17,
                            "type": "form_field",
                            "bbox": {
                                "l": 171.33,
                                "t": 286.13,
                                "r": 175.692209,
                                "b": 274.98
                            },
                            "text": "",
                            "attrs": {
                                "field_kind": "checkbox",
                                "label": "Contractor will provide the following design and development personnel:",
                                "checked": true,
                                "source": "glyph",
                                "label_source": "parent_text",
                                "label_ref": "p154.8.2",
                                "text_offset": 0,
                                "text_span": 0
                            }
                        }
                    ]
                }
            ]
        },
        {
            "id": "p154.9",
            "order": 18,
            "type": "figure",
            "bbox": {
                "l": 43.92,
                "t": 306.96,
                "r": 201.36,
                "b": 150.24
            },
            "text": "",
            "attrs": {
                "block_label": "image",
                "embedded_text": "the\n■"
            }
        },
        {
            "id": "p154.10",
            "order": 19,
            "type": "heading",
            "bbox": {
                "l": 204.24,
                "t": 273.84,
                "r": 324.96,
                "b": 261.84
            },
            "text": "Project Coordinator:",
            "level": 3
        },
        {
            "id": "p154.11",
            "order": 20,
            "type": "text",
            "bbox": {
                "l": 239.76,
                "t": 262.56,
                "r": 551.28,
                "b": 238.32
            },
            "text": "Organizes and coordinates with the development team and acts as liaison with the University Team."
        },
        {
            "id": "p154.12",
            "order": 21,
            "type": "text",
            "bbox": {
                "l": 240,
                "t": 237.6,
                "r": 555.12,
                "b": 213.12
            },
            "text": "○ Ensures the various aspects of the vision and mission of the project are on target in terms of quality, timeline, and budget.",
            "children": [
                {
                    "id": "p154.12.1",
                    "order": 22,
                    "type": "form_field",
                    "bbox": {
                        "l": 240,
                        "t": 237.6,
                        "r": 252,
                        "b": 225.6
                    },
                    "text": "",
                    "attrs": {
                        "field_kind": "radio",
                        "label": "○ Ensures the various aspects of the vision and mission of the project are on target in terms of quality, timeline, and budget.",
                        "source": "glyph_estimate",
                        "bbox_estimated": true,
                        "label_source": "parent_text",
                        "label_ref": "p154.12",
                        "text_offset": 0,
                        "text_span": 1
                    }
                }
            ]
        },
        {
            "id": "p154.13",
            "order": 23,
            "type": "text",
            "bbox": {
                "l": 240,
                "t": 212.88,
                "r": 555.6,
                "b": 176.4
            },
            "text": "Works with the SMEs to ensure the individual courses in the discipline properly build on one another as part of the adopted course sequence."
        },
        {
            "id": "p154.14",
            "order": 24,
            "type": "text",
            "bbox": {
                "l": 240,
                "t": 175.92,
                "r": 552,
                "b": 151.44
            },
            "text": "○ Ensures the program area is systemically tied to and aligns with the appropriate objectives across the curriculum.",
            "children": [
                {
                    "id": "p154.14.1",
                    "order": 25,
                    "type": "form_field",
                    "bbox": {
                        "l": 240,
                        "t": 175.92,
                        "r": 252,
                        "b": 163.92
                    },
                    "text": "",
                    "attrs": {
                        "field_kind": "radio",
                        "label": "○ Ensures the program area is systemically tied to and aligns with the appropriate objectives across the curriculum.",
                        "source": "glyph_estimate",
                        "bbox_estimated": true,
                        "label_source": "parent_text",
                        "label_ref": "p154.14",
                        "text_offset": 0,
                        "text_span": 1
                    }
                }
            ]
        },
        {
            "id": "p154.15",
            "order": 26,
            "type": "text",
            "bbox": {
                "l": 240,
                "t": 150.96,
                "r": 557.28,
                "b": 126.48
            },
            "text": "Works with the development team at the onset to ensure the program mapping aligns at a macro-level."
        },
        {
            "id": "p154.16",
            "order": 27,
            "type": "text",
            "bbox": {
                "l": 240.24,
                "t": 126.48,
                "r": 530.16,
                "b": 88.8
            },
            "text": "o Conducts interval reviews throughout the development process to ensure the individual course lesson plans and course strategy align properly."
        },
        {
            "id": "p154.17",
            "order": 28,
            "type": "text",
            "bbox": {
                "l": 273.36,
                "t": 79.92,
                "r": 330.72,
                "b": 67.68
            },
            "text": "Page 3 of 17",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}