            "id": "p86.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 81.12,
                "t": 737.76,
                "r": 266.88,
                "b": 724.08
            },
            "text": "CONNOLLY CONSULTING ENGINEERS",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p86.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 437.04,
                "t": 736.08,
                "r": 530.4,
                "b": 722.64
            },
            "text": "Phase A Narrative",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p86.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 689.52,
                "r": 343.44,
                "b": 672
            },
            "text": "III. Proposed HVAC Design Solutions",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 66.72,
                "t": 661.68,
                "r": 531.12,
                "b": 589.44
            },
            "text": "It should be noted that the estimated individual costs provided below do not encompass all the miscellaneous work involved in this project. Various tasks such as removing equipment, patching walls, hiring cranes, and other miscellaneous expenses contribute to the overall project cost, which is not explicitly accounted for in the itemized breakdown. Equipment cost estimates include material, labor, and electrical circuiting if needed. Refer to as-built drawing M-1 for proposed equipment locations."
        },
        {
            "id": "p86.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 581.28,
                "r": 169.44,
                "b": 568.8
            },
            "text": "A. Air Handling Unit:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 102.48,
                "t": 566.4,
                "r": 526.32,
                "b": 509.04
            },
            "text": "1. Remove the existing split system air handler, condenser, and duct furnace. Due to space limitations inside the mechanical room, provide a new 335 MBH, packaged air system outside, on grade, with a smoke detector in the supply air duct. Provide a new equipment pad for the unit which will be designated DOAS-1. The estimated cost is $226,000."
        },
        {
            "id": "p86.7",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 67.68,
                "t": 508.32,
                "r": 176.16,
                "b": 496.08
            },
            "text": "B. Attic Vapor Barrier:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.8",
            "order": 8,
            "type": "list",
            "bbox": {
                "l": 101.76,
                "t": 493.68,
                "r": 538.08,
                "b": 393.84
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p86.8.1",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 103.44,
                        "t": 493.68,
                        "r": 528.72,
                        "b": 437.52
                    },
                    "text": "Provide a continuous vapor barrier at the bottom of the roof trusses across the whole building to stop untreated air from entering the conditioned space inside the building. Provide batt insulation to fill gaps where existing insulation is missing or deteriorated. The estimated cost is $11,500.",
                    "marker": "1."
                },
                {
                    "id": "p86.8.2",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 101.76,
                        "t": 435.6,
                        "r": 538.08,
                        "b": 393.84
                    },
                    "text": "Provide 24\"x24\" access hatches for each mechanical device in the attic space. The estimated cost is 4,550. This is a less expensive solution than installing walk boards and lighting for equipment access to comply what the Kentucky Building Code.",
                    "marker": "2."
                }
            ]
        },
        {
            "id": "p86.9",
            "order": 11,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 392.16,
                "r": 186.24,
                "b": 379.68
            },
            "text": "C. Electric Duct Heaters:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.10",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 102,
                "t": 377.04,
                "r": 538.08,
                "b": 350.64
            },
            "text": "1. Replace existing electric duct heaters and add access panels in the ductwork to both sides of the heaters for serviceability. The estimated cost is $28,840."
        },
        {
            "id": "p86.11",
            "order": 13,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 348.72,
                "r": 150.72,
                "b": 336.48
            },
            "text": "D. Exhaust Fans:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.12",
            "order": 14,
            "type": "list",
            "bbox": {
                "l": 102,
                "t": 333.84,
                "r": 533.28,
                "b": 146.4
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p86.12.1",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 333.84,
                        "r": 494.16,
                        "b": 306.24
                    },
                    "text": "Replace the attic ventilation exhaust fans EF-1,3 with new inline axial fans of equal performance. The estimated combined cost for both fans is $9,000.",
                    "marker": "1."
                },
                {
                    "id": "p86.12.2",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 102,
                        "t": 304.32,
                        "r": 533.28,
                        "b": 277.2
                    },
                    "text": "Replace EF-2 with a smaller capacity inline axial fan since one of the branches served by the existing fan is capped and no longer used. The estimated cost is $4,500.",
                    "marker": "2."
                },
                {
                    "id": "p86.12.3",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 102,
                        "t": 275.04,
                        "r": 526.8,
                        "b": 220.08
                    },
                    "text": "Replace the inline exhaust fan, EF-4, with two individual ceiling mounted fans. One fan to serve the restroom and another to serve the storage room. New fans to be powered via a new wall switch in their respective rooms. The estimated combined cost for both fans is $2,700.",
                    "marker": "3."
                },
                {
                    "id": "p86.12.4",
                    "order": 18,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 217.44,
                        "r": 531.6,
                        "b": 189.84
                    },
                    "text": "Replace HEF-1,2 with a new set of centrifugal fume exhaust fans on the existing equipment pad. The estimated combined cost for both fans is $52,650.",
                    "marker": "4."
                },
                {
                    "id": "p86.12.5",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.24,
                        "t": 188.16,
                        "r": 530.16,
                        "b": 146.4
                    },
                    "text": "Provide a new 2,000 CFM exhaust fan (EF-5) as general ventilation to the Analysis Room to comply with the Kentucky Building Code's Laboratory exhaust requirements. Duct the general exhaust to louvers L-6,7. The estimated cost is $9,750.",
                    "marker": "5."
                }
            ]
        },
        {
            "id": "p86.13",
            "order": 20,
            "type": "heading",
            "bbox": {
                "l": 67.68,
                "t": 145.44,
                "r": 141.84,
                "b": 132.72
            },
            "text": "E. Tile Ceiling:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p86.14",
            "order": 21,
            "type": "text",
            "bbox": {
                "l": 102.48,
                "t": 130.56,
                "r": 440.64,
                "b": 117.6
            },
            "text": "1. Replace ACT ceiling tiles in storage room. The estimated cost is $1,100."
        },
        {
            "id": "p86.15",
            "order": 22,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 116.16,
                "r": 183.36,
                "b": 103.44
            },
            "text": "F. Grilles and Diffusers:",
            "level": 3
        },
        {
            "id": "p86.16",
            "order": 23,
            "type": "footer",
            "bbox": {
                "l": 76.8,
                "t": 52.56,
                "r": 84.96,
                "b": 41.28
            },
            "text": "5",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p86.17",
            "order": 24,
            "type": "footer",
            "bbox": {
                "l": 114.48,
                "t": 53.28,
                "r": 325.44,
                "b": 39.84
            },
            "text": "Ph: (859) 402-0221 Email: trent@cceky.co",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p86.18",
            "order": 25,
            "type": "footer",
            "bbox": {
                "l": 403.44,
                "t": 51.36,
                "r": 521.76,
                "b": 39.36
            },
            "text": "Website: www.cceky.com",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}