            "text": "Location Hydraulic Report\nMarch 2026",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p17.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 87.84,
                "t": 723.84,
                "r": 260.64,
                "b": 710.64
            },
            "text": "c. Existing Conditions Modeling",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p17.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 86.64,
                "t": 708,
                "r": 543.12,
                "b": 665.04
            },
            "text": "The existing peak flows through the cross drains were estimated using the SCS Curve Number method (TR-55) and NOAA rainfall depths (from NOAA Atlas 14 Point Precipitation Frequency Estimates). ICPR software (version 4.07.08) was used to determine peak stages associated with these flows."
        },
        {
            "id": "p17.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 86.64,
                "t": 656.4,
                "r": 542.4,
                "b": 599.52
            },
            "text": "Cross drain locations and sizes were estimated based on survey and confirmed based on site visits. There no existing permitted stormwater ponds for SR 72 within the project limits. Roadway runoff is generally conveyed via a roadside ditch, which then discharges to a cross drain. The cross-drain systems discharge to existing outfalls."
        },
        {
            "id": "p17.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 86.88,
                "t": 590.64,
                "r": 543.12,
                "b": 518.88
            },
            "text": "CatchmentSim (CSIM) software was used to develop the DEM for the project to serve as the basis of analysis. LiDAR elevation information was obtained from 2018 United States Geologic Survey (USGS) data. Project specific survey data was merged with the LiDAR data to create the projects 3ftx3ft DEM model. Subbasins were delineated in the software and refined using the best available data including existing plans, permits and field review."
        },
        {
            "id": "p17.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 86.88,
                "t": 510,
                "r": 543.12,
                "b": 409.2
            },
            "text": "An existing conditions model was created in ICPR4 (Version 4.0.03). Inputs including soils and land use data were primarily parameterized in ArcGIS and then imported into ICPR for modeling. Nodes were placed in ICPR to represent basins and links were used to connect basins. Irregular weir cross sections were extracted from the DEM. Node stage-storage was estimated using the DEM at half-foot increments. Initial stages were reviewed based on the presence of water from the field reconnaissance and/or aerial imagery. For the project modeling, the Peace River was assumed to be a constant elevation at the initial stage of 14.49 ft NAVD."
        },
        {
            "id": "p17.7",
            "order": 7,
            "type": "figure",
            "bbox": {
                "l": 45,
                "t": 77.45,
                "r": 119.148,
                "b": 41.2
            },
            "text": "",
            "attrs": {
                "source": "pdf_image"
            }
        },
        {
            "id": "p17.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 483.12,
                "t": 56.88,
                "r": 536.88,
                "b": 44.16
            },
            "text": "Page | 12",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p17.9",
            "order": 9,
            "type": "footer",
            "bbox": {
                "l": 47.76,
                "t": 74.4,
                "r": 114.48,
                "b": 43.2
            },
            "text": "",
            "attrs": {
                "block_label": "footer_image"
            }
        },
        {
            "id": "p17.10",
            "order": 10,
            "type": "footer",
            "bbox": {
                "l": 124.08,
                "t": 73.2,
                "r": 465.12,
                "b": 45.36
            },
            "text": "SR 72 from CR 661 to SR 70 & SR 70 from CR 661 to the Peace River Bridge\nFM #: 443123-1-22-01",