{
    "document_id": 12721,
    "page": 6,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 12833,
    "item_count": 9,
    "counts_by_type": {
        "caption": 1,
        "footer": 1,
        "heading": 1,
        "table": 1,
        "table_cell": 3,
        "text": 2
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p6.1",
            "order": 1,
            "type": "caption",
            "bbox": {
                "l": 400.8,
                "t": 688.32,
                "r": 538.8,
                "b": 654.72
            },
            "text": "Northbound Tamiami Trail (US 41/SR 45)\nComplete Street Improvements\nfrom William Street to Peace River Bridge",
            "attrs": {
                "block_label": "figure_title"
            }
        },
        {
            "id": "p6.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 82.32,
                "t": 677.04,
                "r": 244.08,
                "b": 657.36
            },
            "text": "Proposed Improvements",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p6.3",
            "order": 3,
            "type": "table",
            "bbox": {
                "l": 78.96,
                "t": 678.670794,
                "r": 544.56,
                "b": 427.68
            },
            "text": "",
            "attrs": {
                "block_label": "table",
                "n_rows": 2,
                "n_cols": 2,
                "integrity": {
                    "cells_checked": 3,
                    "cells_flagged": 1,
                    "flags": [
                        {
                            "row": 1,
                            "col": 0,
                            "coverage": 0.48,
                            "text": "2 Continuous thru-lanes with dedicated turn lanes- Allows m…"
                        }
                    ]
                }
            },
            "children": [
                {
                    "id": "p6.3.1",
                    "order": 4,
                    "type": "table_cell",
                    "bbox": {
                        "l": 83.8835,
                        "t": 678.670794,
                        "r": 241.985299,
                        "b": 658.5484240000001
                    },
                    "text": "Proposed improvements",
                    "attrs": {
                        "row": 0,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true
                    }
                },
                {
                    "id": "p6.3.2",
                    "order": 5,
                    "type": "table_cell",
                    "bbox": {
                        "l": 403.322937,
                        "t": 666.340417,
                        "r": 536.809021,
                        "b": 656.279232
                    },
                    "text": "from William Street to Peace River Bridge",
                    "attrs": {
                        "row": 0,
                        "col": 1,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true
                    }
                },
                {
                    "id": "p6.3.3",
                    "order": 6,
                    "type": "table_cell",
                    "bbox": {
                        "l": 78.96,
                        "t": 548.28,
                        "r": 544.56,
                        "b": 427.68
                    },
                    "text": "2 Continuous thru-lanes with dedicated turn lanes- Allows motorists to drive through Downtown Punta Gorda without lane changesTraffic calming measures- Roundabout at Carmalita Street- New traffic signal with crosswalks at Retta EsplanadeDedicated bike lanesAdditional crosswalks throughout project limitsNew pedestrian signal",
                    "attrs": {
                        "row": 1,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 2
                    }
                }
            ]
        },
        {
            "id": "p6.4",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 68.88,
                "t": 403.2,
                "r": 522.72,
                "b": 267.84
            },
            "text": "Proposed Improvements include adding dedicated turn lanes throughout the corridor, adding a roundabout at the intersection of Carmalita Street, adding a new traffic signal at Retta Esplanade, and implementing pedestrian/bicycle safety improvements. These improvements include sidewalks along Tamiami Trail and a new pedestrian signal near Sacred Heart Catholic Church on southbound Tamiami Trail to connect to the Punta Gorda Pathways Linear Park."
        },
        {
            "id": "p6.5",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 69.84,
                "t": 246.96,
                "r": 502.08,
                "b": 209.52
            },
            "text": "Additionally, through lanes will be shifted so drivers no longer have to switch lanes to drive through Downtown Punta Gorda."
        },
        {
            "id": "p6.6",
            "order": 9,
            "type": "footer",
            "bbox": {
                "l": 592.56,
                "t": 17.28,
                "r": 600.48,
                "b": 5.52
            },
            "text": "6",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}