{
    "document_id": 12654,
    "page": 7,
    "width_pt": 612,
    "height_pt": 1008,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 12765,
    "item_count": 24,
    "counts_by_type": {
        "header": 2,
        "heading": 3,
        "list": 2,
        "list_item": 13,
        "text": 4
    },
    "build_ms": 3,
    "items": [
        {
            "id": "p7.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 88.08,
                "t": 971.76,
                "r": 363.12,
                "b": 957.36
            },
            "text": "Jackson Township Council Meeting of October 26, 2021",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p7.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 451.44,
                "t": 972,
                "r": 512.64,
                "b": 957.12
            },
            "text": "Page 7 of 31",
            "attrs": {
                "block_label": "number"
            },
            "level": 2
        },
        {
            "id": "p7.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 105.12,
                "t": 928.8,
                "r": 308.16,
                "b": 913.68
            },
            "text": "V. Responsibility for obtaining permit",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p7.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 104.64,
                "t": 899.28,
                "r": 502.08,
                "b": 869.76
            },
            "text": "The property owner receiving the soil/fill material is responsible for obtaining the permit."
        },
        {
            "id": "p7.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 105.84,
                "t": 850.32,
                "r": 226.32,
                "b": 835.44
            },
            "text": "VI. Duration of permit",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p7.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 104.64,
                "t": 821.28,
                "r": 511.68,
                "b": 777.36
            },
            "text": "Each permit issued under the terms of this chapter shall be valid only for the location(s) and soil/fill material described therein and shall be valid for the duration of the project specified in the permit application."
        },
        {
            "id": "p7.7",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 105.36,
                "t": 758.4,
                "r": 320.88,
                "b": 743.52
            },
            "text": "VII. Permit Application Requirements",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p7.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 105.36,
                "t": 729.6,
                "r": 479.04,
                "b": 713.76
            },
            "text": "The procedure to apply for a Soil/Fill Importation Permit shall be as follows:"
        },
        {
            "id": "p7.9",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 122.64,
                "t": 702,
                "r": 522.96,
                "b": 144.48
            },
            "text": "",
            "attrs": {
                "item_count": 11
            },
            "children": [
                {
                    "id": "p7.9.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.88,
                        "t": 702,
                        "r": 505.92,
                        "b": 628.32
                    },
                    "text": "All applications for a Soil/Fill Importation Permit shall be filed with Township Engineer who shall administer the applications and permits. The Township Engineer shall determine the completeness of the application. Failure to submit a complete application shall not extend the deadline for submission of an application required by this Chapter.",
                    "marker": "A."
                },
                {
                    "id": "p7.9.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.64,
                        "t": 615.12,
                        "r": 522.96,
                        "b": 502.8
                    },
                    "text": "A fee, in the amount of $500.00 shall be remitted at the time the application is submitted. In addition, the applicant shall post with the Township Clerk an initial escrow of $2,500.00 to cover any engineering, legal or other costs generated by an application and filed with the Clerk at the time the application is submitted. The applicant shall maintain a minimum escrow balance of $1,500.00 at all times thereafter. The application shall, at a minimum, include the following information and accompanied by a map or maps which indicate the following:",
                    "marker": "B."
                },
                {
                    "id": "p7.9.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.36,
                        "t": 490.32,
                        "r": 514.08,
                        "b": 475.68
                    },
                    "text": "Certification of taxes that are paid and current with respect to the property.",
                    "marker": "i."
                },
                {
                    "id": "p7.9.4",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 463.2,
                        "r": 522.96,
                        "b": 434.16
                    },
                    "text": "Boundary lines of the entire tract of land within which the proposed soil or earth importation will take place.",
                    "marker": "ii."
                },
                {
                    "id": "p7.9.5",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 140.64,
                        "t": 421.92,
                        "r": 522.96,
                        "b": 392.4
                    },
                    "text": "The limits and boundaries of the proposed work area, showing the location of markers or monuments set on or in the ground to define said limits.",
                    "marker": "iii."
                },
                {
                    "id": "p7.9.6",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 140.64,
                        "t": 380.4,
                        "r": 513.36,
                        "b": 350.64
                    },
                    "text": "The lot and block numbers of the subject parcel and all adjoining land as shown on the Official Tax Map and identification of the owners thereof.",
                    "marker": "iv."
                },
                {
                    "id": "p7.9.7",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 339.12,
                        "r": 518.64,
                        "b": 296.88
                    },
                    "text": "The existing grades and proposed contour lines and finished grades for the entire proposed work area, contour lines should normally be at one-foot intervals.",
                    "marker": "v."
                },
                {
                    "id": "p7.9.8",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 283.68,
                        "r": 521.28,
                        "b": 240.48
                    },
                    "text": "The location of all existing and proposed streets and rights of way including those included within 500 feet of the property line of the property in question.",
                    "marker": "vi."
                },
                {
                    "id": "p7.9.9",
                    "order": 18,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.36,
                        "t": 228,
                        "r": 485.28,
                        "b": 213.6
                    },
                    "text": "The location of all points of ingress and egress to the tract of land.",
                    "marker": "vii."
                },
                {
                    "id": "p7.9.10",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 200.64,
                        "r": 491.28,
                        "b": 172.08
                    },
                    "text": "The location of all streams, wetlands, significant vegetation, forest association, wildlife habitats.",
                    "marker": "viii."
                },
                {
                    "id": "p7.9.11",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.36,
                        "t": 159.6,
                        "r": 391.92,
                        "b": 144.48
                    },
                    "text": "Map indicating truck route to and from the site.",
                    "marker": "ix."
                }
            ]
        },
        {
            "id": "p7.10",
            "order": 21,
            "type": "text",
            "bbox": {
                "l": 141.84,
                "t": 132,
                "r": 420.96,
                "b": 116.64
            },
            "text": "A soil/fill reclamation plan which includes the following:"
        },
        {
            "id": "p7.11",
            "order": 22,
            "type": "list",
            "bbox": {
                "l": 159.84,
                "t": 104.88,
                "r": 359.76,
                "b": 75.12
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p7.11.1",
                    "order": 23,
                    "type": "list_item",
                    "bbox": {
                        "l": 160.8,
                        "t": 104.88,
                        "r": 344.16,
                        "b": 90
                    },
                    "text": "The method of stock piling topsoil.",
                    "marker": "1."
                },
                {
                    "id": "p7.11.2",
                    "order": 24,
                    "type": "list_item",
                    "bbox": {
                        "l": 159.84,
                        "t": 89.52,
                        "r": 359.76,
                        "b": 75.12
                    },
                    "text": "Proposed grading and final elevations.",
                    "marker": "2."
                }
            ]
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}