{
    "document_id": 12565,
    "page": 12,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 12676,
    "item_count": 21,
    "counts_by_type": {
        "footer": 1,
        "header": 1,
        "heading": 1,
        "list": 2,
        "list_item": 16
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p12.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 70.08,
                "t": 755.76,
                "r": 425.28,
                "b": 743.52
            },
            "text": "20260308_LCPC_Zoning_Oridnance_Amendment_1_of_2026_V2_1_Data_Centers",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p12.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 122.64,
                "t": 718.8,
                "r": 542.16,
                "b": 470.88
            },
            "text": "",
            "attrs": {
                "item_count": 6
            },
            "children": [
                {
                    "id": "p12.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.64,
                        "t": 718.8,
                        "r": 541.68,
                        "b": 677.76
                    },
                    "text": "The applicant shall use Tier 4 or greater generators that are subject to stringent emission standards aimed at reducing pollutants and improving air quality and that operate at the lowest dBA levels.",
                    "marker": "2."
                },
                {
                    "id": "p12.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.88,
                        "t": 677.28,
                        "r": 542.16,
                        "b": 581.04
                    },
                    "text": "All building roofs shall be solar ready, which includes designing and constructing buildings in a manner that facilitates and optimizes the installation of roof-mounted solar energy systems at some point after the building has been constructed. All Data Center and battery energy storage system uses shall install on-site solar energy generation systems sufficient to offset a minimum of 25% of the facility's projected annual electricity consumption during normal operations. The applicant shall submit a Solar Energy Plan prepared by a qualified professional demonstrating:",
                    "marker": "3."
                },
                {
                    "id": "p12.2.3",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 168.24,
                        "t": 580.08,
                        "r": 541.2,
                        "b": 554.16
                    },
                    "text": "The use's projected annual electricity consumption in kilowatt hours (kWh);",
                    "marker": "a."
                },
                {
                    "id": "p12.2.4",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 167.76,
                        "t": 553.2,
                        "r": 509.76,
                        "b": 539.76
                    },
                    "text": "The type, capacity, and location of proposed solar energy systems;",
                    "marker": "b."
                },
                {
                    "id": "p12.2.5",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 168.24,
                        "t": 539.04,
                        "r": 540.72,
                        "b": 512.64
                    },
                    "text": "Calculations showing that the proposed systems will generate at least 25% of the projected annual consumption;",
                    "marker": "c."
                },
                {
                    "id": "p12.2.6",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 167.52,
                        "t": 511.68,
                        "r": 542.16,
                        "b": 470.88
                    },
                    "text": "A timeline for installation of solar energy systems, which shall be completed no later than 12 months following issuance of the certificate of occupancy for the Data Center or BESS.",
                    "marker": "d."
                }
            ]
        },
        {
            "id": "p12.3",
            "order": 9,
            "type": "heading",
            "bbox": {
                "l": 87.84,
                "t": 470.4,
                "r": 238.56,
                "b": 456.48
            },
            "text": "K. Emergency Management",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p12.4",
            "order": 10,
            "type": "list",
            "bbox": {
                "l": 105.36,
                "t": 451.44,
                "r": 542.4,
                "b": 81.12
            },
            "text": "",
            "attrs": {
                "item_count": 10
            },
            "children": [
                {
                    "id": "p12.4.1",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 106.08,
                        "t": 451.44,
                        "r": 541.2,
                        "b": 423.84
                    },
                    "text": "The applicant shall submit an Emergency Response Plan (ERP) prepared by a qualified professional. The ERP shall:",
                    "marker": "1."
                },
                {
                    "id": "p12.4.2",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.88,
                        "t": 422.88,
                        "r": 541.2,
                        "b": 380.88
                    },
                    "text": "Be reviewed and accepted by the local fire department and emergency management services as part of the [conditional use/special exception/land development] process;",
                    "marker": "a."
                },
                {
                    "id": "p12.4.3",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 123.36,
                        "t": 376.32,
                        "r": 541.2,
                        "b": 347.28
                    },
                    "text": "Include detailed procedures for fire suppression, containment, ventilation, and evacuation;",
                    "marker": "b."
                },
                {
                    "id": "p12.4.4",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.64,
                        "t": 342.72,
                        "r": 540.96,
                        "b": 313.68
                    },
                    "text": "Include an evaluation of the access roads and hydrant locations within the site to ensure suitable access for emergency equipment within the site;",
                    "marker": "c."
                },
                {
                    "id": "p12.4.5",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.64,
                        "t": 309.36,
                        "r": 541.2,
                        "b": 279.6
                    },
                    "text": "Ensure that all first responders receive adequate training specific to the installed system;",
                    "marker": "d."
                },
                {
                    "id": "p12.4.6",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 122.88,
                        "t": 275.52,
                        "r": 542.16,
                        "b": 234.48
                    },
                    "text": "Include provisions for annual fire safety inspections demonstrating compliance with fire safety standards to be performed by a qualified professional on behalf of the Data Center.",
                    "marker": "e."
                },
                {
                    "id": "p12.4.7",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 124.08,
                        "t": 233.28,
                        "r": 541.44,
                        "b": 178.56
                    },
                    "text": "Each Data Center operation shall provide 24-hour emergency contact signage visible at the access entrance. Signs shall include the company name (if applicable), the owner/representative's name, the telephone number, and the corresponding local power company's name and telephone number.",
                    "marker": "f."
                },
                {
                    "id": "p12.4.8",
                    "order": 18,
                    "type": "list_item",
                    "bbox": {
                        "l": 123.12,
                        "t": 177.36,
                        "r": 541.44,
                        "b": 150.96
                    },
                    "text": "Each Data Center operation shall provide municipal officials, and any emergency responders that serve that community with a copy of an emergency response plan.",
                    "marker": "g."
                },
                {
                    "id": "p12.4.9",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 123.6,
                        "t": 150.24,
                        "r": 541.44,
                        "b": 123.84
                    },
                    "text": "Each Data Center operation shall provide residents within 0.5 miles an emergency preparedness plan.",
                    "marker": "h."
                },
                {
                    "id": "p12.4.10",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 105.36,
                        "t": 123.36,
                        "r": 542.4,
                        "b": 81.12
                    },
                    "text": "Any Data Center use proposing battery storage or any other device or group of devices capable of storing energy in order to supply electrical energy at a later time, whether the energy is stored for use on-site or off-site, shall demonstrate compliance with",
                    "marker": "2."
                }
            ]
        },
        {
            "id": "p12.5",
            "order": 21,
            "type": "footer",
            "bbox": {
                "l": 299.04,
                "t": 62.88,
                "r": 313.44,
                "b": 52.32
            },
            "text": "12",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}